← Planning Wire

Solar farmsDecisionCork

Cork City Council grants permission for 1.7 MW solar farm at Cork Airport, Located on Kinsale Road, Cork city

19 May 2025 · Permission.ie Planning Wire · from the Cork City Council planning register · published 1 September 2026

Cork City Council granted permission on 19 May 2025 for a 1.7 MW solar farm at Cork Airport, Located on Kinsale Road, an application first lodged on 18 December 2024.

Key facts

Reference
2443516
Planning authority
Cork City Council
Location
Cork Airport, Located on Kinsale Road, Cork
Received
18 December 2024
Application type
PERMISSION
Stated capacity
1.7 MW
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision date
19 May 2025

In context

There were 335 nationally in the past twelve months. Of the 573 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 19 May 2025. If no appeal is lodged, the council’s decision stands and a final grant issues.

The development description, as lodged

Verbatim from the Cork City Council register. This is the source for every figure in the story above.

Permission to erect 1.7 MWp or 13382.61 sqm Solar Photovoltaic (PV) in a Carport System in Cork Airport and associated site works comprising of the development will consist of photovoltaic panels with a capacity of 1.70 MWp incorporating a carport system along with all ancillary cabling and electrical infrastructure. this includes a new trench for ductwork terminating at the switch room situated at the front of the terminal building as well as one LV/MV transformer. additionally the development will include temporary welfare facilities and a compound for storing materials required for the installation as detailed in the plans.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Cork City Council grants permission for 1.7 MW solar farm at Cork Airport, Located on Kinsale Road, Cork city", 19 May 2025. https://www.permission.ie/news/cork-city-council/2443516

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/cork-city-council/2443516">Cork City Council grants permission for 1.7 MW solar farm at Cork Airport, Located on Kinsale Road, Cork city</a>, Permission.ie analysis of the national planning register, 19 May 2025.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2443516.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Cork the week it appears.

Set up alerts
Cork City Council grants permission for 1.7 MW solar farm at Cork Airport, Located on Kinsale Road, Cork city | Permission.ie