Solar farmsLodgedCork
3.8-hectare solar farm proposed at Ballybeg Turbeagh Co.Cork, Co. Cork
31 May 2024 · Permission.ie Planning Wire · from the Cork County Council planning register · published 31 August 2026
is seeking a 10-year planning permission and an operational period of 40 Years lodged plans with Cork County Council on 31 May 2024 for a 3.8-hectare solar farm at Ballybeg Turbeagh Co.Cork. The application seeks a 10-year permission and an operational life of 40 years. A decision is due by 25 July 2024.
Key facts
- Reference
- 24/5008
- Planning authority
- Cork County Council
- Location
- Ballybeg Turbeagh Co.Cork
- Applicant
- is seeking a 10-year planning permission and an operational period of 40 Years
- Received
- 31 May 2024
- Application type
- PERMISSION
- Site area
- 3.8 hectares
- Permission sought
- 10 years
- Operational life
- 40 years
- Status
- INCOMPLETED APPLICATION
- Decision due
- 25 July 2024
- Submissions until
- 4 July 2024 (closed)
- Council file
- View on the Cork County Council planning portal
In context
It is one of 51 solar farm applications Cork County Council has received in the past twelve months, against 329 nationally. Of the 569 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council is due to decide by 25 July 2024, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Cork County Council register. This is the source for every figure in the story above.
Permission to construct a photovoltaic (Solar PV) energy generation scheme with a total area of 3.76ha within the townland of Ballybeg & Turbeagh, Co. Cork. The development will consist of the installation of 4,186 no. ground mounted Solar PV arrays, a 20kV substation, the installation of 120m of 20kV underground electrical cabling from the proposed substation to an existing pole and overhead line to connect to the national grid, the upgrade of an existing entrance off the local road to serve as a permanent site entrance for the solar farm and all associated site development works including upgrading 80m of existing tracks and installing 435m of new access track of 3m wide and all associated site works. The applicant is seeking a 10-year planning permission and an operational period of 40 Years.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "3.8-hectare solar farm proposed at Ballybeg Turbeagh Co.Cork, Co. Cork", 31 May 2024. https://www.permission.ie/news/cork-county-council/24%2F5008
<p>Source: <a href="https://www.permission.ie/news/cork-county-council/24%2F5008">3.8-hectare solar farm proposed at Ballybeg Turbeagh Co.Cork, Co. Cork</a>, Permission.ie analysis of the national planning register, 31 May 2024.</p>
Map, site boundary, timeline and nearby applications for 24/5008.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Cork the week it appears.
Set up alerts