Wind energyLodgedCork
9-turbine wind farm with 175m turbines proposed at Polnareagha, Ardskeagh, Co. Cork
28 June 2024 · Permission.ie Planning Wire · from the Cork County Council planning register · published 9 November 2026
An applicant lodged plans with Cork County Council on 28 June 2024 for a 9-turbine wind farm with 175m turbines at Polnareagha, Ardskeagh. The application seeks an operational life of 35 years. A decision is due by 22 August 2024.
Key facts
- Reference
- 24/5215
- Planning authority
- Cork County Council
- Location
- Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork
- Received
- 28 June 2024
- Application type
- PERMISSION
- Stated capacity
- 4.5 MW
- Turbines
- 9
- Turbine height
- 175 m
- Operational life
- 35 years
- Status
- INCOMPLETED APPLICATION
- Decision due
- 22 August 2024
- Submissions until
- 1 August 2024 (closed)
- Council file
- View on the Cork County Council planning portal
In context
It is one of 10 wind energy applications Cork County Council has received in the past twelve months, against 62 nationally. Of the 78 such applications decided by councils in the past three years, 74% were granted.
What happens next
The five-week window for public submissions has closed. The council is due to decide by 22 August 2024, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Cork County Council register. This is the source for every figure in the story above.
Permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Croughta, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The prop
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "9-turbine wind farm with 175m turbines proposed at Polnareagha, Ardskeagh, Co. Cork", 28 June 2024. https://www.permission.ie/news/cork-county-council/24%2F5215
<p>Source: <a href="https://www.permission.ie/news/cork-county-council/24%2F5215">9-turbine wind farm with 175m turbines proposed at Polnareagha, Ardskeagh, Co. Cork</a>, Permission.ie analysis of the national planning register, 28 June 2024.</p>
Map, site boundary, timeline and nearby applications for 24/5215.
All wind energy applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Cork the week it appears.
Set up alerts