Solar farmsDecisionCork
Cork County Council refuses permission for 13.8 MW solar farm at Berrings Near Berrings, Co. Cork
3 December 2025 · Permission.ie Planning Wire · from the Cork County Council planning register · published 31 August 2026
Cork County Council refused permission on 3 December 2025 for a 13.8 MW solar farm at Berrings Near Berrings, an application first lodged on 5 December 2024.
Key facts
- Reference
- 24/6312
- Planning authority
- Cork County Council
- Location
- Berrings Near Berrings Co. Cork
- Received
- 5 December 2024
- Application type
- Permission
- Site area
- 21.3 hectares
- Stated capacity
- 13.8 MW
- Permission sought
- 10 years
- Operational life
- 35 years
- Status
- Appeal decided ACP - Case Closed
- Decision
- Refused
- Decision date
- 3 December 2025
- Council file
- View on the Cork County Council planning portal
In context
It is one of 52 solar farm applications Cork County Council has received in the past twelve months, against 337 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 3 December 2025. If no appeal is lodged, the council’s decision stands and a final grant issues. The applicant sought a 10-year permission, which sets how long they have to start the development.
The development description, as lodged
Verbatim from the Cork County Council register. This is the source for every figure in the story above.
The development will consist of: The development and operation of a c.13.8MW solar photovoltaic (PV) farm at a 21.25ha site located off the L2760. The application seeks a 10-year permission with an operational lifetime of 35 years and includes: • Approximately 37, 000 solar photovoltaic panels on ground mounted metal frames including string inverters mounted to the rear of the panels, with a maximum table height above ground of approximately 2.7 metres; • 1 no. 38kV substation including 1 no. MV switch room, 1 no. IPP control room, 1 no. ESB switch room and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter fencing; • CCTV; • Construction and operational access provided from the existing site entrance off the L2760; • Internal tracks, site landscaping and all associated site enabling and site development works
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Cork County Council refuses permission for 13.8 MW solar farm at Berrings Near Berrings, Co. Cork", 3 December 2025. https://www.permission.ie/news/cork-county-council/24%2F6312
<p>Source: <a href="https://www.permission.ie/news/cork-county-council/24%2F6312">Cork County Council refuses permission for 13.8 MW solar farm at Berrings Near Berrings, Co. Cork</a>, Permission.ie analysis of the national planning register, 3 December 2025.</p>
Map, site boundary, timeline and nearby applications for 24/6312.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Cork the week it appears.
Set up alerts