← Planning Wire

Solar farmsLodgedCork

Solar farm proposed at Castlemagner Co. Cork Cork, Co. Cork

30 May 2025 · Permission.ie Planning Wire · from the Cork County Council planning register · published 31 August 2026

An applicant lodged plans with Cork County Council on 30 May 2025 for a solar farm at Castlemagner Co. Cork Cork. A decision is due by 24 July 2025.

Key facts

Reference
25/5030
Planning authority
Cork County Council
Location
Castlemagner Co. Cork Cork
Received
30 May 2025
Application type
PERMISSION
Status
INCOMPLETED APPLICATION
Decision due
24 July 2025
Submissions until
3 July 2025 (closed)

In context

It is one of 52 solar farm applications Cork County Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.

What happens next

The five-week window for public submissions has closed. The council is due to decide by 24 July 2025, unless it requests further information, which stops the clock.

The development description, as lodged

Verbatim from the Cork County Council register. This is the source for every figure in the story above.

Permission for development which consists of the construction of a new Wastewater Treatment Plant (WwTP) in the townland of Castlemagner Co. Cork to replace the existing public and private WwTP’s currently servicing the agglomeration. The development will consist of the following: Inlet works, including: • 2 no. gravity inlets from the existing public WwTP & the private WwTP. • Full flow to treatment pumping station; • Inlet screen. Primary treatment, including: • 2 no. primary settlement tanks; • 2 no. rotating biological contactors. Secondary treatment, including; • 2 no. Humus tanks. Discharge works, including: • Final effluent collection chamber; • Final discharge manhole; • Final effluent gravity pipeline and headwall along the Lisduggan North stream. Sludge treatment works, including: • Primary sludge pumping station; • 1 no. sludge holding tank; • 2 no. sludge drying reed beds; • Mixed liquor returns pumping station. 1 no. stormwater storage tank and pumping station. Construction of a new solar farm to provide a source of renewable energy to partly supply the WwTP. 1no. control and administration building. Ancillary site works, including: • Upgrade of the existing entrance and access road from the L1042 roadway and construction of paved site roadways. • Installation of instrumentation, monitoring equipment & controls in accordance with Uisce Éireann’s technical standards. • General groundworks, fencing, landscaping, ducting, pipework, manholes / chambers and drainage works including for filter drains, surface water pipelines & a swale. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Solar farm proposed at Castlemagner Co. Cork Cork, Co. Cork", 30 May 2025. https://www.permission.ie/news/cork-county-council/25%2F5030

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/cork-county-council/25%2F5030">Solar farm proposed at Castlemagner Co. Cork Cork, Co. Cork</a>, Permission.ie analysis of the national planning register, 30 May 2025.</p>
Full application record

Map, site boundary, timeline and nearby applications for 25/5030.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Cork the week it appears.

Set up alerts