Solar farmsLodgedCork
51-hectare solar farm proposed at Ballinure, Ballyoneen, Co. Cork
25 November 2025 · Permission.ie Planning Wire · from the Cork County Council planning register · published 31 August 2026
An applicant lodged plans with Cork County Council on 25 November 2025 for a 51-hectare solar farm at Ballinure, Ballyoneen. The application seeks a 10-year permission. A decision is due by 28 January 2026.
Key facts
- Reference
- 25/6573
- Planning authority
- Cork County Council
- Location
- in the townlands of Ballinure, Ballyoneen, Ballyrobert, Ballyrobert,, Ballysallagh, Caherdesert, Commons, Curraghard, Curraghphlibbode, Desert, Dundullerick East, Dundullerick West,, Lissurla, Mellefontstown, Rathaneague and Rathcobane in County Cork
- Received
- 25 November 2025
- Application type
- Permission
- Site area
- 51 hectares
- Permission sought
- 10 years
- Status
- Invalid - Case Closed
- Decision due
- 28 January 2026
- Submissions until
- 7 January 2026 (closed)
- Council file
- View on the Cork County Council planning portal
In context
It is one of 52 solar farm applications Cork County Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council is due to decide by 28 January 2026, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Cork County Council register. This is the source for every figure in the story above.
A 10 year planning permission for a solar farm with a total area of circa 51 hectares. The solar farm will consist of solar panels on ground mounted frames, 7 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 3 no. Ring Main Units, 2 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L5816, L5813, R626, L7692 and L7691 public roads (including 2 no. Horizontal Directional Drill under the Owenageeragh River and the Ballyerra Stream) to connect solar farm field parcels, security fencing, CCTV, access tracks, 6 no. stream/drain deck crossings, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via 4 no. entrances from the L5816. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Cork County Council Reference 24/5630, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The NIS includes an assessment of the grid connection for the solar farm project comprising a 220kV electricity substation and underground electricity cabling to the existing Knockraha 220kV substation which has been consented by An Coimisiún Pleanála (ABP-321518-24) and is situated in the townlands of Aghaduff, Ballinbrittig, Ballynabrannagh West, Ballynagaul, Ballynaglogh, Ballynanelagh, Ballynaskeha, Ballysallagh, Ballyvatta, Glengarriff More, Killeena and Pigeonhill (Townlands), Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "51-hectare solar farm proposed at Ballinure, Ballyoneen, Co. Cork", 25 November 2025. https://www.permission.ie/news/cork-county-council/25%2F6573
<p>Source: <a href="https://www.permission.ie/news/cork-county-council/25%2F6573">51-hectare solar farm proposed at Ballinure, Ballyoneen, Co. Cork</a>, Permission.ie analysis of the national planning register, 25 November 2025.</p>
Map, site boundary, timeline and nearby applications for 25/6573.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Cork the week it appears.
Set up alerts