Wind energyDecisionDonegal
Donegal County Council grants permission for wind farm grid connection works at KILLYMASNY, LETTERKENNY, Co. Donegal
14 December 2023 · Permission.ie Planning Wire · from the Donegal County Council planning register · published 15 September 2026
Donegal County Council granted permission on 14 December 2023 for a wind farm grid connection works at KILLYMASNY, LETTERKENNY, an application first lodged on 23 October 2023.
Key facts
- Reference
- 2351609
- Planning authority
- Donegal County Council
- Location
- KILLYMASNY, LETTERKENNY, CO. DONEGAL
- Received
- 23 October 2023
- Application type
- PERMISSION
- Site area
- 0.3 hectares
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision date
- 14 December 2023
In context
It is one of 10 wind energy applications Donegal County Council has received in the past twelve months, against 60 nationally. Of the 84 such applications decided by councils in the past three years, 74% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 14 December 2023. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Donegal County Council register. This is the source for every figure in the story above.
(1) INSTALLATION OF A GRID TRANSFORMER IN THE PREVIOUSLY CONSENTED AND CONSTRUCTED LENALEA WIND FARM SUBSTATION TO PLANNING REFERENCES: 09/50116 AND 20/50835 AND (2) CONSTRUCTION OF AN INDEPENDANT POWER PRODUCER (IPP) BUILDING (MEASURING 149M2) ALONG WITH ASSOCIATED GRID COMPENSATION EQUIPMENT, A DIESEL GENERATOR, AND UNDER GROUND CABLE TRENCHES LINKING THE PROPOSED IPP BUILDING TO THE GRID TRANSFORMER, AUXILIARY EQUIPMENT, A BOREHOLE AND ALL ANCILLARY WORKS
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Donegal County Council grants permission for wind farm grid connection works at KILLYMASNY, LETTERKENNY, Co. Donegal", 14 December 2023. https://www.permission.ie/news/donegal-county-council/2351609
<p>Source: <a href="https://www.permission.ie/news/donegal-county-council/2351609">Donegal County Council grants permission for wind farm grid connection works at KILLYMASNY, LETTERKENNY, Co. Donegal</a>, Permission.ie analysis of the national planning register, 14 December 2023.</p>
Map, site boundary, timeline and nearby applications for 2351609.
All wind energy applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Donegal the week it appears.
Set up alerts