Donegal County Council grants permission for 13.9-hectare solar farm at LIFFORD PO, Co. Donegal

8 October 2026 · Permission.ie Planning Wire · from the Donegal County Council planning register · published 20 October 2026

Donegal County Council granted permission on 8 October 2026 for a 13.9-hectare solar farm at LIFFORD PO, an application first lodged on 19 December 2025.

Key facts

Reference
2562310
Planning authority
Donegal County Council
Location
TULLYDONNELL UPPER & CONVOY TOWNPARKS, CONVOY, LIFFORD PO
Received
19 December 2025
Application type
PERMISSION
Site area
13.9 hectares
Permission sought
10 years
Operational life
40 years
Status
DECISION MADE
Decision
CONDITIONAL
Decision date
8 October 2026

In context

It is one of 8 solar farm applications Donegal County Council has received in the past twelve months, against 347 nationally. Of the 562 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 8 October 2026. If no appeal is lodged, the council’s decision stands and a final grant issues. The applicant sought a 10-year permission, which sets how long they have to start the development.

The development description, as lodged

Verbatim from the Donegal County Council register. This is the source for every figure in the story above.

A 10-YEAR PLANNING PERMISSION FOR CONSTRUCTION OF A PHOTOVOLTAIC SOLAR FARM DEVELOPMENT AND ALL ASSOCIATED SITE WORKS. THE DEVELOPMENT WILL CONSIST OF LINEAR ARRAYS OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED FRAMES OVER TWO ADJACENT PLOTS OF CA. 13.88 HECTARES OVERALL AREA, INCLUDING: ASSOCIATED CABLING & DUCTING; A 20KV ELECTRICAL CONTROL BUILDING; SITE ENTRANCES AND ACCESS TRACKS; TRANSFORMERS AND INVERTERS; PERIMETER FENCING UP TO 2.5 METRES HIGH; POLE MOUNTED CCTV CAMERAS UP TO 3 METRES HIGH; UNDERGROUNDED ELECTRICAL CABLE TO CONNECT THE TWO SEPARATE SOLAR FARM PLOTS; TEMPORARY CONTRACTOR’S COMPOUND AND TEMPORARY STORAGE AREA; AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED UNDERGROUND GRID CONNECTION CABLE OF CA. 607 METRES LENGTH WILL BE INSTALLED ALONG THE L-5754 AND L-1074 LOCAL ROADS FROM THE PROPOSED ON-SITE ELECTRICAL CONTROL BUILDING INTO THE EXISTING CONVOY ESB SUBSTATION. THE PROPOSED DEVELOPMENT WILL HAVE A 40-YEAR OPERATIONAL LIFESPAN FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Donegal County Council grants permission for 13.9-hectare solar farm at LIFFORD PO, Co. Donegal", 8 October 2026. https://www.permission.ie/news/donegal-county-council/2562310

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/donegal-county-council/2562310">Donegal County Council grants permission for 13.9-hectare solar farm at LIFFORD PO, Co. Donegal</a>, Permission.ie analysis of the national planning register, 8 October 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2562310.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Donegal the week it appears.

Set up alerts