Solar farmsLodgedDonegal
8.9-hectare solar farm proposed at RAPHOE LIFFORD PO, Co. Donegal
27 February 2026 · Permission.ie Planning Wire · from the Donegal County Council planning register · published 1 September 2026
An applicant lodged plans with Donegal County Council on 27 February 2026 for an 8.9-hectare solar farm at RAPHOE LIFFORD PO.
Key facts
- Reference
- 2660296
- Planning authority
- Donegal County Council
- Location
- THE ROYAL & PRIOR COMPREHENSIVE SCHOOL, DERRY ROAD, RAPHOE LIFFORD PO
- Received
- 27 February 2026
- Application type
- PERMISSION
- Site area
- 8.9 hectares
- Status
- FURTHER INFORMATION
- Submissions until
- 2 April 2026 (closed)
In context
It is one of 7 solar farm applications Donegal County Council has received in the past twelve months, against 337 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Donegal County Council register. This is the source for every figure in the story above.
(1) CONSTRUCTION OF A NEW 2,240M2 TWO-STOREY SCHOOL BUILDING, CONTAINING: SPECIALIST TEACHING ROOMS FOR SCIENCE, CONSTRUCTION STUDIES, ENGINEERING, ART, AND HOME ECONOMICS; PHYSICAL EDUCATION FACILITIES INCLUDING A PE HALL, FITNESS SUITE, AND CHANGING SUITES; TOILETS, STORES, AND PLANT ROOMS; 2 NO. SPECIAL NEEDS CLASSROOMS AND ASSOCIATED SUPPORT ACCOMMODATION, INCLUDING MULTI-ACTIVITY, PRACTICAL ACTIVITY, AND DAILY LIVING SKILLS, (2) A ROOF MOUNTED PHOTOVOLTAIC PANEL SYSTEM FOR COMPLIANCE WITH PART L OF THE BUILDING REGULATIONS, (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING NEW LANDSCAPING, SECURE PLAY AREA AND SENSORY GARDEN FOR SPECIAL NEEDS, EXTERNAL STEPS TO EXISTING TECHNOLOGY HUB, RELOCATION OF BALL COURTS, INTERCONNECTING PATHWAYS AND ASSOCIATED SITE DEVELOPMENT AND SERVICE INFRASTRUCTURE WORKS, (4) DEMOLITION AND REMOVAL OF THE EXISTING PE HALL AND TWO INDEPENDENT TEMPORARY CLASSROOM UNITS AND (5) MINOR ALTERATIONS TO THE EXISTING 3-STOREY PERMANENT SCHOOL BUILDING INCLUDING THE INTERNAL CONVERSION OF TWO EXISTING SCIENCE LABORATORIES TO GENERAL CLASSROOMS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "8.9-hectare solar farm proposed at RAPHOE LIFFORD PO, Co. Donegal", 27 February 2026. https://www.permission.ie/news/donegal-county-council/2660296
<p>Source: <a href="https://www.permission.ie/news/donegal-county-council/2660296">8.9-hectare solar farm proposed at RAPHOE LIFFORD PO, Co. Donegal</a>, Permission.ie analysis of the national planning register, 27 February 2026.</p>
Map, site boundary, timeline and nearby applications for 2660296.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Donegal the week it appears.
Set up alerts