← Planning Wire · Donegal County Council news

Wind energyLodgedDonegal

4-turbine wind farm with 126.5m turbines proposed at CRILLY, TULLYLINN, Co. Donegal

8 September 2026 · Permission.ie Planning Wire · from the Donegal County Council planning register · published 20 October 2026

An applicant lodged plans with Donegal County Council on 8 September 2026 for a 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN. The application seeks the accelerated RED III consenting route for renewables. A decision is due by 2 November 2026.

Key facts

Reference
2661665
Planning authority
Donegal County Council
Location
CRILLY, TULLYLINN, PETTIGOE DONEGAL PO
Received
8 September 2026
Application type
PERMISSION
Site area
24.5 hectares
Turbines
4
Turbine height
126.5 m
Status
NEW APPLICATION
Decision due
2 November 2026
Submissions until
12 October 2026 (closed)

In context

It is one of 8 wind energy applications Donegal County Council has received in the past twelve months, against 55 nationally. Of the 77 such applications decided by councils in the past three years, 73% were granted.

What happens next

The five-week window for public submissions has closed. The council is due to decide by 2 November 2026, unless it requests further information, which stops the clock.

The development description, as lodged

Verbatim from the Donegal County Council register. This is the source for every figure in the story above.

VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP HEIGHT OF 126.5M, ALL ANCILLARY DEVELOPMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS. THE PERMITTED DEVELOPMENT INCLUDES ACCESS OFF SEEGRONAN ROAD, KILLETER, CASTLEDERG, CO. TYRONE AND NO ALTERATION IS PROPOSED TO THE NATURE, SCALE OR DESIGN OF THE PERMITTED DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "4-turbine wind farm with 126.5m turbines proposed at CRILLY, TULLYLINN, Co. Donegal", 8 September 2026. https://www.permission.ie/news/donegal-county-council/2661665

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/donegal-county-council/2661665">4-turbine wind farm with 126.5m turbines proposed at CRILLY, TULLYLINN, Co. Donegal</a>, Permission.ie analysis of the national planning register, 8 September 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2661665.

All wind energy applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Donegal the week it appears.

Set up alerts