← Planning Wire · Donegal County Council news

Wind energyDecisionDonegal

Donegal County Council grants permission for 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, Co. Donegal

30 October 2026 · Permission.ie Planning Wire · from the Donegal County Council planning register · published 3 November 2026

Donegal County Council granted permission on 30 October 2026 for a 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, an application first lodged on 8 September 2026.

Key facts

Reference
2661665
Planning authority
Donegal County Council
Location
CRILLY, TULLYLINN, PETTIGOE DONEGAL PO
Received
8 September 2026
Application type
PERMISSION
Site area
24.5 hectares
Turbines
4
Turbine height
126.5 m
Status
DECISION MADE
Decision
CONDITIONAL
Decision date
30 October 2026

In context

It is one of 9 wind energy applications Donegal County Council has received in the past twelve months, against 59 nationally. Of the 78 such applications decided by councils in the past three years, 74% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 30 October 2026. If no appeal is lodged, the council’s decision stands and a final grant issues.

The development description, as lodged

Verbatim from the Donegal County Council register. This is the source for every figure in the story above.

VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP HEIGHT OF 126.5M, ALL ANCILLARY DEVELOPMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS. THE PERMITTED DEVELOPMENT INCLUDES ACCESS OFF SEEGRONAN ROAD, KILLETER, CASTLEDERG, CO. TYRONE AND NO ALTERATION IS PROPOSED TO THE NATURE, SCALE OR DESIGN OF THE PERMITTED DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Donegal County Council grants permission for 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, Co. Donegal", 30 October 2026. https://www.permission.ie/news/donegal-county-council/2661665

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/donegal-county-council/2661665">Donegal County Council grants permission for 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, Co. Donegal</a>, Permission.ie analysis of the national planning register, 30 October 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2661665.

All wind energy applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Donegal the week it appears.

Set up alerts