Wind energyDecisionDonegal
Donegal County Council grants permission for 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, Co. Donegal
30 October 2026 · Permission.ie Planning Wire · from the Donegal County Council planning register · published 3 November 2026
Donegal County Council granted permission on 30 October 2026 for a 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, an application first lodged on 8 September 2026.
Key facts
- Reference
- 2661665
- Planning authority
- Donegal County Council
- Location
- CRILLY, TULLYLINN, PETTIGOE DONEGAL PO
- Received
- 8 September 2026
- Application type
- PERMISSION
- Site area
- 24.5 hectares
- Turbines
- 4
- Turbine height
- 126.5 m
- Status
- DECISION MADE
- Decision
- CONDITIONAL
- Decision date
- 30 October 2026
In context
It is one of 9 wind energy applications Donegal County Council has received in the past twelve months, against 59 nationally. Of the 78 such applications decided by councils in the past three years, 74% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 30 October 2026. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Donegal County Council register. This is the source for every figure in the story above.
VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP HEIGHT OF 126.5M, ALL ANCILLARY DEVELOPMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS. THE PERMITTED DEVELOPMENT INCLUDES ACCESS OFF SEEGRONAN ROAD, KILLETER, CASTLEDERG, CO. TYRONE AND NO ALTERATION IS PROPOSED TO THE NATURE, SCALE OR DESIGN OF THE PERMITTED DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Donegal County Council grants permission for 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, Co. Donegal", 30 October 2026. https://www.permission.ie/news/donegal-county-council/2661665
<p>Source: <a href="https://www.permission.ie/news/donegal-county-council/2661665">Donegal County Council grants permission for 4-turbine wind farm with 126.5m turbines at CRILLY, TULLYLINN, Co. Donegal</a>, Permission.ie analysis of the national planning register, 30 October 2026.</p>
Map, site boundary, timeline and nearby applications for 2661665.
All wind energy applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Donegal the week it appears.
Set up alerts