Solar farmsLodgedDublin
2.1-hectare solar farm proposed at The Novum Building, Dublin
29 September 2025 · Permission.ie Planning Wire · from the Dublin City Council planning register · published 31 July 2026
An applicant lodged plans with Dublin City Council on 29 September 2025 for a 2.1-hectare solar farm at The Novum Building. A decision is due by 21 November 2025.
Key facts
- Reference
- WEB5255/25
- Planning authority
- Dublin City Council
- Location
- The Novum Building, Clonshaugh Business And Technology Park, Dublin, D17 YW27
- Received
- 29 September 2025
- Application type
- Permission
- Site area
- 2.1 hectares
- Status
- Decision Notice Issued
- Decision
- APPLICATION DECLARED INVALID
- Decision date
- 30 September 2025
In context
It is one of 32 solar farm applications Dublin City Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council is due to decide by 21 November 2025, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Dublin City Council register. This is the source for every figure in the story above.
The development will consist of the installation of roof mounted solar PV arrays on the existing manufacturing, storage, distribution and administration buildings on this site together with a solar PV array to a new inclined canopy over a revised car park layout and a new solar pv inverter and battery storage building in the existing services yard, all as indicated on the planning application drawings.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "2.1-hectare solar farm proposed at The Novum Building, Dublin", 29 September 2025. https://www.permission.ie/news/dublin-city-council/WEB5255%2F25
<p>Source: <a href="https://www.permission.ie/news/dublin-city-council/WEB5255%2F25">2.1-hectare solar farm proposed at The Novum Building, Dublin</a>, Permission.ie analysis of the national planning register, 29 September 2025.</p>
Map, site boundary, timeline and nearby applications for WEB5255/25.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Dublin the week it appears.
Set up alerts