Solar farmsDecisionDublin
Dublin City Council refuses permission for 81-hectare solar farm at 9, Hanover Quay, Dublin
16 April 2025 · Permission.ie Planning Wire · from the Dublin City Council planning register · published 31 July 2026
Dublin City Council refused permission on 16 April 2025 for an 81-hectare solar farm at 9, Hanover Quay, an application first lodged on 21 February 2025.
Key facts
- Reference
- WEBDSDZ1350/25
- Planning authority
- Dublin City Council
- Location
- 9, Hanover Quay, Dublin 2
- Received
- 21 February 2025
- Application type
- Permission
- Site area
- 81 hectares
- Status
- Decision Notice Issued
- Decision
- REFUSE PERMISSION
- Decision date
- 16 April 2025
In context
It is one of 32 solar farm applications Dublin City Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 16 April 2025. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Dublin City Council register. This is the source for every figure in the story above.
PROTECTED STRUCTURE: Planning permission at 9 Hanover Quay, and adjoining Grand Canal Dock, Dublin 2, both protected structures. This application relates to a proposed development within the North Lotts & Grand Canal Dock Strategic Development Zone Planning Scheme Area. The proposed development consists of the change of use from dwelling to mixed use café/bar with soundproof entertainment venue, 35 bedroom hotel, removal of non-historic internal walls, insertion of floor openings for lifts and stairs, enlargement of one opening in the north wall of the protected structure, raising roof truss level at No 9 Hanover Quay, demolition of modern conservatory and replacement with a building adjoining the protected stone malt house building, with access to quayside, two-storey extension above existing roofline, green roof with solar panels, extended basement, and ancillary siteworks to facilitate access to the venue.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Dublin City Council refuses permission for 81-hectare solar farm at 9, Hanover Quay, Dublin", 16 April 2025. https://www.permission.ie/news/dublin-city-council/WEBDSDZ1350%2F25
<p>Source: <a href="https://www.permission.ie/news/dublin-city-council/WEBDSDZ1350%2F25">Dublin City Council refuses permission for 81-hectare solar farm at 9, Hanover Quay, Dublin</a>, Permission.ie analysis of the national planning register, 16 April 2025.</p>
Map, site boundary, timeline and nearby applications for WEBDSDZ1350/25.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Dublin the week it appears.
Set up alerts