Solar farmsDecisionGalway
Galway County Council grants permission for 4.3-hectare solar farm at Athenry, Co. Galway
18 August 2026 · Permission.ie Planning Wire · from the Galway County Council planning register · published 1 September 2026
Galway County Council granted permission on 18 August 2026 for a 4.3-hectare solar farm at Athenry, an application first lodged on 24 June 2026.
Key facts
- Reference
- 2661048
- Planning authority
- Galway County Council
- Location
- Raheen Ballygarraun North & Ballygarraun South, Athenry, Co. Galway
- Received
- 24 June 2026
- Application type
- PERMISSION
- Site area
- 4.3 hectares
- Status
- DECISION MADE
- Decision
- CONDITIONAL
- Decision date
- 18 August 2026
In context
It is one of 13 solar farm applications Galway County Council has received in the past twelve months, against 339 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 18 August 2026. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Galway County Council register. This is the source for every figure in the story above.
for a Large-Scale Residential Development. The application is being made under the provisions of the Planning and Development (Amendment) (Large Scale Residential Development) Act 2021. The proposed development will consist of the following: construction of 136 no. residential units comprising of: 21 no. 2-bed residential units, 104 no. 3-bed residential units, 11 no. 4-bed residential units; the provision of pedestrian and cyclist infrastructure fronting the development on the Raheen Road (L-3103); the installation of a raised zebra crossing on the Raheen Road (L-3103); provision of 2 no. pedestrian and cyclist entrances from the Raheen Road (L-3103) and 1 no. vehicular entrance from the Raheen Road (L-3103); the provision of hard and soft landscaping and boundary treatments including a new stone wall along the southern boundary; the setback of the existing stonewall along the southeastern boundary; provision of shared communal and private open space, car and bicycle parking, bin storage, public lighting, photovoltaic panels at roof level and 2 no. ESB substations; all associated surface water, watermain and foul water drainage services and connections (including nature-based drainage solutions and a pumping station) and all associated site works and ancillary services necessary to facilitate the proposed development. The application contains a statement setting out how the proposal is consistent with the objectives of the Galway County Development Plan 2022-2028
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Galway County Council grants permission for 4.3-hectare solar farm at Athenry, Co. Galway", 18 August 2026. https://www.permission.ie/news/galway-county-council/2661048
<p>Source: <a href="https://www.permission.ie/news/galway-county-council/2661048">Galway County Council grants permission for 4.3-hectare solar farm at Athenry, Co. Galway</a>, Permission.ie analysis of the national planning register, 18 August 2026.</p>
Map, site boundary, timeline and nearby applications for 2661048.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Galway the week it appears.
Set up alerts