← Planning Wire

Solar farmsDecisionKerry

Kerry County Council refuses permission for 119.3-hectare solar farm at Listowel, Co. Kerry

30 September 2025 · Permission.ie Planning Wire · from the Kerry County Council planning register · published 1 September 2026

Kerry County Council refused permission on 30 September 2025 for a 119.3-hectare solar farm at Listowel, an application first lodged on 6 August 2025.

Key facts

Reference
2560684
Planning authority
Kerry County Council
Location
The Application Site lies on approximately 119.3 hectares of land located within the townlands of Ballyline West Coolkeragh and Kilgarvan., Listowel, County Kerry
Received
6 August 2025
Application type
PERMISSION
Site area
119.3 hectares
Permission sought
10 years
Status
APPEALED
Decision
REFUSED
Decision date
30 September 2025
Appeal
PL-500143-KY

In context

It is one of 11 solar farm applications Kerry County Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 30 September 2025. If no appeal is lodged, the council’s decision stands and a final grant issues. The applicant sought a 10-year permission, which sets how long they have to start the development.

The development description, as lodged

Verbatim from the Kerry County Council register. This is the source for every figure in the story above.

The Proposed Development will consist of a 10-year permission for a Solar PV Energy Development across a site of approximately 119.3 hectares. The development will comprise ground-mounted solar PV panels on steel support structures, transformers, internal access tracks, passing bays, crane pads, cable trenches, a permanent operational compound, temporary construction compounds, security fencing and gates, CCTV infrastructure, and all associated site and ancillary works. The proposal also includes a 33kV underground cable connecting to a consented grid node. This cable, which runs through the townlands of Ballyline West and Tullamore, is included for assessment purposes. Any necessary consents for this element will be sought separately, as required. A Natura Impact Statement has been submitted with this application.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Kerry County Council refuses permission for 119.3-hectare solar farm at Listowel, Co. Kerry", 30 September 2025. https://www.permission.ie/news/kerry-county-council/2560684

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/kerry-county-council/2560684">Kerry County Council refuses permission for 119.3-hectare solar farm at Listowel, Co. Kerry</a>, Permission.ie analysis of the national planning register, 30 September 2025.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2560684.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Kerry the week it appears.

Set up alerts