← Planning Wire · Kerry County Council news

Solar farmsDecisionKerry

Kerry County Council refuses permission for 152.6-hectare solar farm at Lacka More Parkmore Lissireen, Co. Kerry

5 October 2026 · Permission.ie Planning Wire · from the Kerry County Council planning register · published 20 October 2026

Kerry County Council refused permission on 5 October 2026 for a 152.6-hectare solar farm at Lacka More Parkmore Lissireen, an application first lodged on 26 September 2025.

Key facts

Reference
2560875
Planning authority
Kerry County Council
Location
Site in the Townlands of Lacka More Parkmore Lissireen Tullacrimeen Aulaneduff Ballyconnell, Fahavane Knockbrack West Knocknacaska and Knocknagun, County Kerry
Received
26 September 2025
Application type
PERMISSION
Site area
152.6 hectares
Permission sought
10 years
Status
APPLICATION FINALISED
Decision
REFUSED
Decision date
5 October 2026

In context

It is one of 12 solar farm applications Kerry County Council has received in the past twelve months, against 347 nationally. Of the 562 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 5 October 2026. If no appeal is lodged, the council’s decision stands and a final grant issues. The applicant sought a 10-year permission, which sets how long they have to start the development.

The development description, as lodged

Verbatim from the Kerry County Council register. This is the source for every figure in the story above.

REDIII: The development will consist of: a 10-year permission for the development of a solar farm on an overall site of c. 152.6 hectares consisting of the following: c. 449,366 sq m of solar photovoltaic panels on ground mounted steel frames; 19 no. hardstanding locations for electrical skids; new internal access tracks with passing bays; underground power and communications cables and ducts, including along the L-6507, R557, and L-2034 public roads, 3no. Horizontal Directional Drilling (HDD) locations associated with the underground cable route; a total of 5 no. solar farm site entrances (1no. from the R557 public road, 3no. from the L-6507 public road and 1no. from the L-10562 public road); access gates; 5no. temporary site compounds of c. 4,050 sq m each to be used for storage during construction activity; 28no. Battery Energy Storage System (BESS) Containers and 7no. associated MV Stations as well as associated CCTV, BESS compound fencing, gate, boundary fencing and all associated ancillary drainage development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Kerry County Council refuses permission for 152.6-hectare solar farm at Lacka More Parkmore Lissireen, Co. Kerry", 5 October 2026. https://www.permission.ie/news/kerry-county-council/2560875

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/kerry-county-council/2560875">Kerry County Council refuses permission for 152.6-hectare solar farm at Lacka More Parkmore Lissireen, Co. Kerry</a>, Permission.ie analysis of the national planning register, 5 October 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2560875.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Kerry the week it appears.

Set up alerts