Solar farmsLodgedKildare
6.4-hectare solar farm proposed at Monread Business Park, Monread Road, Co. Kildare
9 October 2026 · Permission.ie Planning Wire · from the Kildare County Council planning register · published 17 November 2026
An applicant lodged plans with Kildare County Council on 9 October 2026 for a 6.4-hectare solar farm at Monread Business Park, Monread Road. The application seeks an operational life of 40 years.
Key facts
- Reference
- 2661114
- Planning authority
- Kildare County Council
- Location
- Monread Business Park, Monread Road, Naas Co. Kildare
- Received
- 9 October 2026
- Application type
- PERMISSION
- Site area
- 6.4 hectares
- Operational life
- 40 years
- Status
- INCOMPLETED APPLICATION
- Submissions until
- 12 November 2026 (closed)
In context
It is one of 23 solar farm applications Kildare County Council has received in the past twelve months, against 337 nationally. Of the 558 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Kildare County Council register. This is the source for every figure in the story above.
for the development of a solar farm on a site having a total area of approximately 6.4 hectares. The proposed development will comprise 9,240 no. photovoltaic solar modules mounted on ground-mounted support structures connected to 15 no. inverters; 1 no. single-storey electrical transformer station; 1 no. single-storey spare-parts storage container; 1 no. weather station; underground electrical ducting and cabling within the application site; security fencing and access gates; CCTV cameras; internal access tracks; a temporary construction compound; landscaping; boundary treatment; and all associated ancillary development, site development and drainage works. Construction and operational access will be provided via the existing internal access road serving the site, which connects to Monread Road through the existing signal-controlled junction serving Monread Business Park. The proposed solar farm will have an operational lifespan of 40 years from the date of commissioning.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "6.4-hectare solar farm proposed at Monread Business Park, Monread Road, Co. Kildare", 9 October 2026. https://www.permission.ie/news/kildare-county-council/2661114
<p>Source: <a href="https://www.permission.ie/news/kildare-county-council/2661114">6.4-hectare solar farm proposed at Monread Business Park, Monread Road, Co. Kildare</a>, Permission.ie analysis of the national planning register, 9 October 2026.</p>
Map, site boundary, timeline and nearby applications for 2661114.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Kildare the week it appears.
Set up alerts