Solar farmsLodgedKilkenny
2-hectare solar farm proposed at Loan, Castlecomer, Co. Kilkenny
2 October 2026 · Permission.ie Planning Wire · from the Kilkenny County Council planning register · published 13 October 2026
An applicant lodged plans with Kilkenny County Council on 2 October 2026 for a 2-hectare solar farm at Loan, Castlecomer. The application seeks a 10-year permission and an operational life of 40 years. Submissions from the public can be made until 5 November 2026, and a decision is due by 26 November 2026.
Key facts
- Reference
- 2660634
- Planning authority
- Kilkenny County Council
- Location
- Within the townland of Loan, Castlecomer, Co. Kilkenny
- Received
- 2 October 2026
- Application type
- PERMISSION
- Site area
- 2 hectares
- Permission sought
- 10 years
- Operational life
- 40 years
- Status
- NEW APPLICATION
- Decision due
- 26 November 2026
- Submissions until
- 5 November 2026
In context
It is one of 14 solar farm applications Kilkenny County Council has received in the past twelve months, against 351 nationally. Of the 563 such applications decided by councils in the past three years, 92% were granted.
What happens next
Anyone can make a submission or observation to Kilkenny County Council until 5 November 2026, for a fee of €20. Only those who make a submission can later appeal the decision. The council is due to decide by 26 November 2026, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Kilkenny County Council register. This is the source for every figure in the story above.
for development. The development will consist of a 10-year permission for the construction of a Battery Energy Storage System (BESS) on a site of approximately 2.02 hectares. It will comprise 32 no. battery energy storage system units, 8 no. transformers, 1 no. control room, 1 no. switchgear, 1 no. storage container, 2 no. water tanks, underground cabling (including a 33 kV grid connection cable from the on-site switchgear to the substation serving the adjacent solar farm (Planning Reference: 16276)), fencing with access gates, 4 no. closed-circuit television (CCTV) posts, 5 no. lighting posts, 1 no. temporary construction compound, new and upgraded access tracks, and associated landscaping and ancillary works. Access to the Application Site will be provided via an existing access point off the R426, located to the southeast of the Application Site. The access point will be upgraded to facilitate safe entry and exit for traffic. The development will have an operational capacity of up to 20-megawatt peak and is designed to have an operational lifetime of 40 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "2-hectare solar farm proposed at Loan, Castlecomer, Co. Kilkenny", 2 October 2026. https://www.permission.ie/news/kilkenny-county-council/2660634
<p>Source: <a href="https://www.permission.ie/news/kilkenny-county-council/2660634">2-hectare solar farm proposed at Loan, Castlecomer, Co. Kilkenny</a>, Permission.ie analysis of the national planning register, 2 October 2026.</p>
Map, site boundary, timeline and nearby applications for 2660634.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Kilkenny the week it appears.
Set up alerts