← Planning Wire

Housing schemesLodgedLaois

92-home scheme proposed at Portlaoise, Co. Laois

26 June 2025 · Permission.ie Planning Wire · from the Laois County Council planning register · published 1 September 2026

An applicant lodged plans with Laois County Council on 26 June 2025 for a 92-home scheme at Portlaoise.

Key facts

Reference
2560377
Planning authority
Laois County Council
Location
A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois
Received
26 June 2025
Application type
PERMISSION
Site area
3.9 hectares
Homes
92
Status
INCOMPLETED APPLICATION
Submissions until
30 July 2025 (closed)

In context

It is one of 54 housing scheme applications Laois County Council has received in the past twelve months, against 1,561 nationally. Of the 3,032 such applications decided by councils in the past three years, 79% were granted.

What happens next

The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.

The development description, as lodged

Verbatim from the Laois County Council register. This is the source for every figure in the story above.

develop Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 3 & 4 are submitted alongside this Phase 2 application. The Phase 2 site is generally bound by Phases 1A & 1B to the north and agricultural lands to the east (proposed Phase 3), south and west. The development will principally consist of the provision of 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "92-home scheme proposed at Portlaoise, Co. Laois", 26 June 2025. https://www.permission.ie/news/laois-county-council/2560377

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/laois-county-council/2560377">92-home scheme proposed at Portlaoise, Co. Laois</a>, Permission.ie analysis of the national planning register, 26 June 2025.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2560377.

All housing schemes applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Laois the week it appears.

Set up alerts