A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois
N/APlanning application 2560377
Laois - Laois County Council
Proposed Development
develop Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 3 & 4 are submitted alongside this Phase 2 application. The Phase 2 site is generally bound by Phases 1A & 1B to the north and agricultural lands to the east (proposed Phase 3), south and west. The development will principally consist of the provision of 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground
View the full application file on the council's planning portal →Application Details
- Location
- A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Laois County Council
- Site Area
- 3.85 ha
Timeline
- Registration Date
- 26 June 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.
A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois
develop Phase 3 of the wider Sand Wood Development, (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 2 & 4 are submitted alongside this Phase 3 application. The Phase 3 site is generally bound by: Phases 1A & 1B to the north; the Holy Family Schools and agricultural lands (proposed Phase 4) to the east; and agricultural lands to the west (part of which represents the proposed Phase 2) and south. The development will principally consist of the provision of a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.
A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois
construct a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.
A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois
develop as follows: proposed work at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise ,
Permission for development at this c. 2.14 Ha site at Summerhill, Portlaoise, Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road, to the east by Holy Family School Road, and to the west and south by undeveloped agricultural lands. Works are also proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise ,
amend permission to the permitted Neighbourhood Centre building granted under LCC Reg. Ref. 23/60348, The development will principally consist of the minor revisions to the Neighbourhood Centre building, including internal layout changes, elevational changes and amendments to the roof profile. The development results in a reduction in the principal height of the Neighbourhood Centre building from 14.85 metres to 13.36 metres and a reduction in floor area from 1,484 sq m to 1,426 sq m. The development also proposes minor car parking layout changes; landscaping; and all other associated site works above and below ground. The development also proposes minor car parking layout changes; landscaping; and all other associated site works above and below ground.
A site at Summerhill Portlaoise Co. Laois (now known as Sand Wood). , The site is generally bound to the north by Aghnaharna Drive to the east by Holy Family School Road to the south by undeveloped lands and , to the west by a residential development
Proposed works at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian/cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Proposal for the removal of the redundant western arm of the roundabout to the southeast at the Holy Family School Road and the provision of new active travel infrastructure incorporating a two-way cycle track with the adjoining footpath along the eastern boundary which transitions to a shared pedestrian / cycle facility to the north as it approaches the O’Kelly roundabout, and continues on the southern side of Aghnaharna Drive on the western arm of this roundabout. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. A pumping station is proposed southwest of the main development site. The development site area, roadworks, water and drainage works, and pumping station will provide a total application site area of c. 3.39 Ha. The development will consist of: a 2 No. storey Neighbourhood Centre (1,484 sq m) principally comprising a retail unit 361 sq m), a creche (289 sq m), refuse storage (23 sq m) and cycle storage (65 sq m) at ground floor level and office floorspace (746 sq m) at ground and first floor level; the provision of 57 No. houses (comprising of: 5 No. detached dwellings (three-storey 5-bed); 3 No. semi-detached corner dwellings (two-storey 4-bed); 29 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 5 No. 3 No. storey duplexes comprising 5 No. 2-bed units and 5 No. 3-bed units. The development will also include: a new Link Road through the site, providing vehicular entrance/exit to the site via O’Devoy (O’Deevy) roundabout; roof plant at the Neighbourhood Centre; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-stations; lighting; and all associated site and development works above and below ground.
A c. 2.98 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by Aghnaharna Drive to the east by the Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise , Laois
Please see Appendix A of the Application Form for the description of development
A c. 2.98 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by Aghnaharna Drive to the east by the Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise , Laois
For works proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian/cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Proposal for the removal of the redundant western arm of the roundabout to the southeast at the Holy Family School Road and the provision of new active travel infrastructure incorporating a two-way cycle track with the adjoining footpath along the eastern boundary which transitions to a shared pedestrian / cycle facility to the north as it approaches the O’Kelly roundabout, and continues on the southern side of Aghnaharna Drive on the western arm of this roundabout. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. A pumping station is proposed southwest of the main development site. The development site area, roadworks, water and drainage works, and pumping station will provide a total application site area of c. 3.39 Ha. The development will consist of: a 2 No. storey Neighbourhood Centre (1,484 sq m) principally comprising a retail unit 361 sq m), a creche (289 sq m), refuse storage (23 sq m) and cycle storage (65 sq m) at ground floor level and office floorspace (746 sq m) at ground and first floor level; the provision of 57 No. houses (comprising of: 5 No. detached dwellings (three-storey 5-bed); 3 No. semi-detached corner dwellings (two-storey 4-bed); 29 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 5 No. 3 No. storey duplexes comprising 5 No. 2-bed units and 5 No. 3-bed units. The development will also include: a new Link Road through the site, providing vehicular entrance/exit to the site via O’Devoy (O’Deevy) roundabout; roof plant at the Neighbourhood Centre; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-stations; lighting; and all associated site and development works above and below ground.
A c. 2.98 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by Aghnaharna Drive to the east by the Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise , Laois
the change of use of the permitted creche and cycle store to a retail unit; the subdivision and part change of use of the permitted retail unit to a medical centre, retail unit, a refuse store and ESB switchroom; provision of a mezzanine level (c. 139 sq m) above first floor level within the southern extent of the Neighbourhood Centre building to provide additional office floor space; rationalisation of the ground and first floor layouts of the Neighbourhood Centre building and modifications to the footprint of the building, increasing the floor area by c. 57 sq m. The development will result in an overall increase in floor area of the Neighbourhood Centre building by c. 196 sq m, from 1,426 sq m to c. 1,622 sq m. The development also proposes: the provision of 3 No. additional car parking spaces; minor cycle & car parking layout changes; landscaping; boundary treatments; and all other associated site works above and below ground.
A site at Summerhill Portlaoise Co. Laois (now known as 'Sand Wood'). , The site is generally bound to the north by Aghnaharna Drive to the east by Holy Family School Road , and to the west and south by undeveloped lands and a residential development
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?