A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois
N/APlanning application 2660636
Laois - Laois County Council
Proposed Development
make amendments to the residential development permitted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. The proposed amendments principally comprise: the replacement of 18 No. permitted two-storey 4-bed houses within the south-eastern extent of the site with 24 No. houses (19 No. three-storey 3-bed houses and 5 No. two-storey 4-bed houses), resulting in an increase of 6 No. houses; and the repositioning of 4 No. permitted two-storey 4-bed houses further north by approximately 1-metre to align with the front building line of the other permitted houses along the same street. The proposed amendments also comprise: new bicycle stores; amendments to the location and number of car parking (additional 12 No. spaces proposed); private amenity space; hard and soft landscaping; boundary treatments; and all associated works above and below ground.
Application Timeline
Application received
11 Sept 2026
Decision due (upcoming)
5 Nov 2026
Application Details
- Location
- A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Laois County Council
- Site Area
- 3.85 ha
- Floor Area
- 12779 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 11 September 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 5 November 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
develop Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 3 & 4 are submitted alongside this Phase 2 application. The Phase 2 site is generally bound by Phases 1A & 1B to the north and agricultural lands to the east (proposed Phase 3), south and west. The development will principally consist of the provision of 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground
A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois
construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.
A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois
amend the residential development permitted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. The proposed amendments principally comprise: the replacement of 18 No. permitted two-storey 4-bed houses within the south-eastern extent of the site with 24 No. houses (19 No. three-storey 3-bed houses and 5 No. two-storey 4-bed houses), resulting in an increase of 6 No. houses; and the repositioning of 4 No. permitted two-storey 4-bed houses further north by approximately 1-metre to align with the front building line of the other permitted houses along the same street. The proposed amendments also comprise: new bicycle stores; amendments to the location and number of car parking (additional 12 No. spaces proposed); private amenity space; hard and soft landscaping; boundary treatments; and all associated works above and below ground.
A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.
retain amendments to 7 No. houses permitted as part of the residential development granted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. Retention permission is sought for the re-orientation of 6 No. 4-bed houses (‘D’ house type) located along the northern boundary of the site, resulting in the front of the house now facing the internal street to the north; the relocation of the adjacent 4-bed house (‘B1’ house type) further west by approximately 2-metres; and minor amendments to hard and soft landscaping, boundary treatments, car parking and all other associated works above and below ground located adjacent to and within the curtilage of the 7 No. houses. No amendments have been made to the remaining 85 No. permitted residential units.
A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.
retain amendments to 7 No. houses permitted as part of the residential development granted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. Retention permission is sought for the re-orientation of 6 No. 4-bed houses (‘D’ house type) located along the northern boundary of the site, resulting in the front of the house now facing the internal street to the north; the relocation of the adjacent 4-bed house (‘B1’ house type) further west by approximately 2-metres; and minor amendments to hard and soft landscaping, boundary treatments, car parking and all other associated works above and below ground located adjacent to and within the curtilage of the 7 No. houses. No amendments have been made to the remaining 85 No. permitted residential units.
A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.
develop Phase 3 of the wider Sand Wood Development, (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 2 & 4 are submitted alongside this Phase 3 application. The Phase 3 site is generally bound by: Phases 1A & 1B to the north; the Holy Family Schools and agricultural lands (proposed Phase 4) to the east; and agricultural lands to the west (part of which represents the proposed Phase 2) and south. The development will principally consist of the provision of a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.
A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois
construct a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.
A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois
develop as follows: proposed work at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise ,
Permission for development at this c. 2.14 Ha site at Summerhill, Portlaoise, Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road, to the east by Holy Family School Road, and to the west and south by undeveloped agricultural lands. Works are also proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise ,
Please see Appendix A of the Application Form for the description of development
A c. 2.98 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by Aghnaharna Drive to the east by the Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise , Laois
Affected by this application?
Open for submissionsObservations close on Thursday 15 October 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?