A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois

CONDITIONAL

Planning application 2560386

Laois - Laois County Council

Proposed Development

construct a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jun 2025

  2. Further information requested

    22 Aug 2025

  3. Further information received

    17 Oct 2025

  4. Decision: CONDITIONAL

    13 Jan 2026

  5. Decision due

    16 Jan 2026

  6. Grant issued

    24 Feb 2026

Application Details

Location
A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
4.15 ha
Floor Area
74 sq m
Residential Units
74

Timeline

Registration Date
30 June 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 January 2026
Grant Date
24 February 2026
Permission Expires
23 February 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560378N/A26 Jun 2025

develop Phase 3 of the wider Sand Wood Development, (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 2 & 4 are submitted alongside this Phase 3 application. The Phase 3 site is generally bound by: Phases 1A & 1B to the north; the Holy Family Schools and agricultural lands (proposed Phase 4) to the east; and agricultural lands to the west (part of which represents the proposed Phase 2) and south. The development will principally consist of the provision of a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.

A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois

110m
2560379N/A26 Jun 2025

develop Phase 4 of the wider Sand Wood Development, (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 2 & 3 are submitted alongside this Phase 4 application. The Phase 4 site is generally bound by: the Holy Family Schools to the north; Ashewood Walk residential estate and agricultural lands to the east; and agricultural lands to the west (proposed Phase 3) and south. The development will principally consist of the provision of 36 No. 4-bed, 2 No. storey houses. The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground

A c. 1.82 Ha site at Summerhill , Portlaoise , Co. Laois

110m
2560387CONDITIONAL30 Jun 2025

provide 36 No. 4-bed, 2 No. storey houses.The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.

A c. 1.82 Ha site at Summerhill , Portlaoise , Co. Laois

148m
2560377N/A26 Jun 2025

develop Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 3 & 4 are submitted alongside this Phase 2 application. The Phase 2 site is generally bound by Phases 1A & 1B to the north and agricultural lands to the east (proposed Phase 3), south and west. The development will principally consist of the provision of 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground

A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois

148m
2560385CONDITIONAL30 Jun 2025

construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.

A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois

148m
2660624N/A8 Sept 2026

retain amendments to 7 No. houses permitted as part of the residential development granted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. Retention permission is sought for the re-orientation of 6 No. 4-bed houses (‘D’ house type) located along the northern boundary of the site, resulting in the front of the house now facing the internal street to the north; the relocation of the adjacent 4-bed house (‘B1’ house type) further west by approximately 2-metres; and minor amendments to hard and soft landscaping, boundary treatments, car parking and all other associated works above and below ground located adjacent to and within the curtilage of the 7 No. houses. No amendments have been made to the remaining 85 No. permitted residential units.

A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.

148m
2660627N/A8 Sept 2026

amend the residential development permitted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. The proposed amendments principally comprise: the replacement of 18 No. permitted two-storey 4-bed houses within the south-eastern extent of the site with 24 No. houses (19 No. three-storey 3-bed houses and 5 No. two-storey 4-bed houses), resulting in an increase of 6 No. houses; and the repositioning of 4 No. permitted two-storey 4-bed houses further north by approximately 1-metre to align with the front building line of the other permitted houses along the same street. The proposed amendments also comprise: new bicycle stores; amendments to the location and number of car parking (additional 12 No. spaces proposed); private amenity space; hard and soft landscaping; boundary treatments; and all associated works above and below ground.

A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.

148m
2660636N/A11 Sept 2026

make amendments to the residential development permitted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. The proposed amendments principally comprise: the replacement of 18 No. permitted two-storey 4-bed houses within the south-eastern extent of the site with 24 No. houses (19 No. three-storey 3-bed houses and 5 No. two-storey 4-bed houses), resulting in an increase of 6 No. houses; and the repositioning of 4 No. permitted two-storey 4-bed houses further north by approximately 1-metre to align with the front building line of the other permitted houses along the same street. The proposed amendments also comprise: new bicycle stores; amendments to the location and number of car parking (additional 12 No. spaces proposed); private amenity space; hard and soft landscaping; boundary treatments; and all associated works above and below ground.

A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.

148m
2660642N/A14 Sept 2026

retain amendments to 7 No. houses permitted as part of the residential development granted under LCC Reg. Ref. 25/60385 at a c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois. This application relates to Phase 2 of the wider Sand Wood Development (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). The Phase 2 site is generally bound by: agricultural lands to the west; Phases 1A & 1B (permitted under LCC Reg. Refs. 23/60350 & 23/60348, as amended under LCC Reg. Ref. 25/60040) to the north, which are near completion and partially occupied; and Phase 3 (permitted under LCC Reg. Ref. 25/60386) to the south and east. Retention permission is sought for the re-orientation of 6 No. 4-bed houses (‘D’ house type) located along the northern boundary of the site, resulting in the front of the house now facing the internal street to the north; the relocation of the adjacent 4-bed house (‘B1’ house type) further west by approximately 2-metres; and minor amendments to hard and soft landscaping, boundary treatments, car parking and all other associated works above and below ground located adjacent to and within the curtilage of the 7 No. houses. No amendments have been made to the remaining 85 No. permitted residential units.

A c. 3.85 Ha site at Summerhill , Portlaoise , Co. Laois.

228m
18326REFUSED28 May 2018

extension of duration for planning ref. 08/151

Summerhill or Aghnaharna and Ballymoney , Portlaoise.