Proposed Development

extension of duration for planning ref. 08/151

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 May 2018

  2. Decision: REFUSED

    17 Jul 2018

  3. Decision due

    22 Jul 2018

Application Details

Location
Summerhill or Aghnaharna and Ballymoney , Portlaoise.
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Laois County Council

Timeline

Registration Date
28 May 2018
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
17 July 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

102m
2220CONDITIONAL19 Jan 2022

(1) change orientation of 2No. Semi-Detached (Type A) Houses 97 & 98 (Approved under Planning permission 17-396); (2) change boundary treatment of Plot 99

Summerhill Lane , Portlaoise , Co. Laois

112m
18509N/A16 Aug 2018

construct a residential development at Aghnaharna, Portlaoise Co. Laois on a 0.4ha site ( 0.9 acre), within lands previously permitted under Reg Ref : 99/1404. The site is bounded by the Portlaoise Southern Circular road to the south and east, and by the existing residential development, Aghnaharna Drive to the north and west, Access to the site is from the Southern Circular road to the south and from Aghnaharna Drive estate to the north. The development will consist of the removal of 6 partially constructed houses previously permitted and the provision of the following - 14 no two-storey houses in the following mix, 8 no. three -bedroom semi-detached type A units, 4 no. four-bedroom semi-detached type B units and 2 no. two-storey two-bedroom semi-detached Type C units together with all associated site development / car parking / landscaping / boundary detail works. Public Open Space to serve these units has been provided as part of the previously approved application.

Aghnaharna , Portlaoise , Co. Laois.

112m
18232CONDITIONAL17 Apr 2018

renovate and extend house consisting of a ground and first floor extension and include a single storey extension to the side and all associated works

15 Aghnaharna Drive , Summerhill Portlaoise , Co. Laois

112m
18546CONDITIONAL6 Sept 2018

construct a residential development at Aghnaharna, Portlaoise Co. Laois on a 0.49ha site ( 1.2 acre), within lands previously permitted under Reg Ref : 99/1404. The site is bounded by the Portlaoise Southern Circular road to the east, and by the existing residential development, Aghnaharna Drive to the north and west, and by lands subject to a current planning application reg ref.: 18/450 to the south. The development will consist of the removal of 6 partially constructed houses , the completion of the access road previously permitted and the provision of the following - 14 no two-storey houses in the following mix, 8 no. three -bedroom semi-detached type A units, 4 no. four-bedroom semi-detached type B units and 2 no. two-bedroom semi-detached Type C units together with all associated site development / car parking / landscaping / boundary detail works. Public Open Space to serve these units has been provided as part of the previously approved application

Aghnaharna , Portlaoise , Co. Laois

181m
17396CONDITIONAL24 Jul 2017

provide 87 no. two-storey dwellings (38 no. 4-bedroom semi-detched houses, 6 no. 3-bedroom semi-detched houses, 3 no. 5-bedroom detched houses, 22 no. 4-bedroom end of terrace houses and 18 no. 3-bedroom terraced houses) and a single storey creche; lighting; landscaping; bundary treatments; and all associated site development works

Summerhill Lane , Portlaoise , Co. Laois

196m
23164UNCONDITIONAL1 Jun 2023

extend time on planning register reference 17/396

Summerhill Lane , Portlaoise , Co. Laois

200m
2560379N/A26 Jun 2025

develop Phase 4 of the wider Sand Wood Development, (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 2 & 3 are submitted alongside this Phase 4 application. The Phase 4 site is generally bound by: the Holy Family Schools to the north; Ashewood Walk residential estate and agricultural lands to the east; and agricultural lands to the west (proposed Phase 3) and south. The development will principally consist of the provision of 36 No. 4-bed, 2 No. storey houses. The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground

A c. 1.82 Ha site at Summerhill , Portlaoise , Co. Laois

200m
2560387CONDITIONAL30 Jun 2025

provide 36 No. 4-bed, 2 No. storey houses.The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.

A c. 1.82 Ha site at Summerhill , Portlaoise , Co. Laois

228m
2560378N/A26 Jun 2025

develop Phase 3 of the wider Sand Wood Development, (generally bound by: the Southern Circular Road and Aghnaharna Drive to the north; the Holy Family Schools and Ashewood Walk to the east; and agricultural land to the south and west). Phases 1A & 1B (permitted under LCC Reg. Ref. 23/60350 & 23/60348) are currently under construction and applications for Phases 2 & 4 are submitted alongside this Phase 3 application. The Phase 3 site is generally bound by: Phases 1A & 1B to the north; the Holy Family Schools and agricultural lands (proposed Phase 4) to the east; and agricultural lands to the west (part of which represents the proposed Phase 2) and south. The development will principally consist of the provision of a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.

A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois

228m
2560386CONDITIONAL30 Jun 2025

construct a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.

A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois