← Planning Wire

Solar farmsDecisionLimerick

Limerick County Council grants permission for 1 MW solar farm at O'Halloran Rd, National Technological Park, Co. Limerick

23 September 2025 · Permission.ie Planning Wire · from the Limerick County Council planning register · published 1 September 2026

Limerick County Council granted permission on 23 September 2025 for a 1 MW solar farm at O'Halloran Rd, National Technological Park, an application first lodged on 16 April 2025.

Key facts

Reference
2560332
Planning authority
Limerick County Council
Location
O'Halloran Rd, National Technological Park, Castletroy Limerick
Received
16 April 2025
Application type
PERMISSION
Site area
1.8 hectares
Stated capacity
1 MW
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision date
23 September 2025

In context

It is one of 21 solar farm applications Limerick County Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 23 September 2025. If no appeal is lodged, the council’s decision stands and a final grant issues.

The development description, as lodged

Verbatim from the Limerick County Council register. This is the source for every figure in the story above.

the installation of a Solar Photovoltaic (PV) Farm 1MWp (1Megawatt peak) system (1.829 hectare in size) on the existing greenfield area on the north west side of their existing 2.7 hectare campus at O’Halloran Road, National Technology Park, Castletroy, Co. Limerick, Ireland, The Solar Farm will consist of metal PV frames at ground level, an electrical equipment enclosure, hardcore gravel access roadway, perimeter fencing to match local park finishes, making good to existing landscaping, revisions to existing carpark, underground service trenches, and associated site works. This application relates to development, which comprises an activity, which holds an Industrial Emissions Directive Licence (Reg. No. P0973-01)

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Limerick County Council grants permission for 1 MW solar farm at O'Halloran Rd, National Technological Park, Co. Limerick", 23 September 2025. https://www.permission.ie/news/limerick-city-and-county-council/2560332

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/limerick-city-and-county-council/2560332">Limerick County Council grants permission for 1 MW solar farm at O'Halloran Rd, National Technological Park, Co. Limerick</a>, Permission.ie analysis of the national planning register, 23 September 2025.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2560332.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Limerick the week it appears.

Set up alerts
Limerick County Council grants permission for 1 MW solar farm at O'Halloran Rd, National Technological Park, Co. Limerick | Permission.ie