← Planning Wire

Solar farmsLodgedLimerick

70-hectare solar farm proposed at Ballygoghlan, Glin, Co. Limerick

14 August 2026 · Permission.ie Planning Wire · from the Limerick County Council planning register · published 1 September 2026

An applicant lodged plans with Limerick County Council on 14 August 2026 for a 70-hectare solar farm at Ballygoghlan, Glin. The application seeks a 10-year permission and an operational life of 40 years. Submissions from the public can be made until 17 September 2026, and a decision is due by 27 September 2026.

Key facts

Reference
2660943
Planning authority
Limerick County Council
Location
Ballygoghlan, Glin, Co. Limerick
Received
14 August 2026
Application type
PERMISSION
Site area
70 hectares
Permission sought
10 years
Operational life
40 years
Status
NEW APPLICATION
Decision due
27 September 2026
Submissions until
17 September 2026

In context

It is one of 21 solar farm applications Limerick County Council has received in the past twelve months, against 339 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.

What happens next

Anyone can make a submission or observation to Limerick County Council until 17 September 2026, for a fee of €20. Only those who make a submission can later appeal the decision. The council is due to decide by 27 September 2026, unless it requests further information, which stops the clock.

How to make a submission

The development description, as lodged

Verbatim from the Limerick County Council register. This is the source for every figure in the story above.

a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total area of 245.33 ha, 70.01 ha of which lies within Co. Limerick. The application seeks a 10-year permission with an operational lifetime of 40 years and comprises the following – i. Construction and operation of up to 219,706.1sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. iii. Up to 8 no. electrical inverter / transformer skid units. iv. Construction and operational access to the site by 3 no. site entrances using existing field access points. v. 2 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. vi. Customer substation compound consisting of a single storey substation customer building with welfare facilities (217 sqm), all associated electrical plant and apparatus, underground cabling, lighting columns, parking, storage, fencing, wastewater holding tank and rainwater harvesting tank. vii. 33kV collector cable network, joint bays and associated works. viii. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. ix. The decommissioning and reinstatement of the solar farm at the end of its operational life. The elements of the Proposed Project located in Co. Limerick, as described above in i – ix, are the subject of this planning application. The remaining elements, including the construction of up to 541,306.68 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres, internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units, up to 19 no. electrical / inverter transformer skid units, construction and operational access to the site by 6 no. site entrances, using 4 no. existing field access points and 2 no. new access points, 3 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project, 33kV collector cable network, joint ba

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "70-hectare solar farm proposed at Ballygoghlan, Glin, Co. Limerick", 14 August 2026. https://www.permission.ie/news/limerick-city-and-county-council/2660943

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/limerick-city-and-county-council/2660943">70-hectare solar farm proposed at Ballygoghlan, Glin, Co. Limerick</a>, Permission.ie analysis of the national planning register, 14 August 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2660943.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Limerick the week it appears.

Set up alerts