← Planning Wire · Limerick County Council news

Solar farmsLodgedLimerick

Solar farm proposed at Moanoola, Oola, Co. Limerick

5 October 2026 · Permission.ie Planning Wire · from the Limerick County Council planning register

Harmony Solar Limerick Limited lodged plans with Limerick County Council on 5 October 2026 for a solar farm at Moanoola, Oola. Submissions from the public can be made until 8 November 2026, and a decision is due by 29 November 2026.

Live from the council register. This application was read from Limerick County Council’s own register the day it was listed. It has not yet reached the national planning dataset, which runs one to five weeks behind; the full record page, map and site boundary will appear here when it does.

Key facts

Reference
2661152
Planning authority
Limerick County Council
Location
Moanoola, Oola, Co. Limerick
Applicant
Harmony Solar Limerick Limited
Received
5 October 2026
Status
PRE-VALIDATION
Decision due
29 November 2026
Submissions until
8 November 2026

In context

It is one of 21 solar farm applications Limerick County Council has received in the past twelve months, against 347 nationally. Of the 561 such applications decided by councils in the past three years, 92% were granted.

What happens next

Anyone can make a submission or observation to Limerick County Council until 8 November 2026, for a fee of €20. Only those who make a submission can later appeal the decision. The council is due to decide by 29 November 2026, unless it requests further information, which stops the clock.

How to make a submission

The development description, as lodged

Verbatim from the Limerick County Council register. This is the source for every figure in the story above.

a temporary access track from the N24 to the consented 142-ha Ballyvalode Solar Farm comprising four land parcels (Limerick City and County Council Pl. Ref. 211565, An Bord Pleanála Ref. PL91.312712). The temporary access track will be 375 meters long, 5 m in width and will include two designated passing bays of approximately 50 m in length to facilitate the safe passing of construction vehicles and plant machinery. Approximately 40–50 m of localised excavation will be undertaken to facilitate the connection of the floating road to the existing founded road (i.e. the N24 and a gravel access track), with the excavated material replaced by permeable macadam to minimise surface water runoff onto the N24. A drainage swale will be provided along the north-eastern side of the access track to collect and convey surface water, with the track designed to incorporate a 2% crossfall towards the swale to promote effective drainage. The development also includes designated entrance and exit points, perimeter fencing and gates, temporary on-site storage of excavated material pending reinstatement, and all associated ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Solar farm proposed at Moanoola, Oola, Co. Limerick", 5 October 2026. https://www.permission.ie/news/limerick-city-and-county-council/2661152

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/limerick-city-and-county-council/2661152">Solar farm proposed at Moanoola, Oola, Co. Limerick</a>, Permission.ie analysis of the national planning register, 5 October 2026.</p>
Council file

The Limerick County Council record for 2661152, with documents and drawings as lodged.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Limerick the week it appears.

Set up alerts