Wind energyDecisionLouth

Louth County Council grants permission for wind farm grid connection works at Wuxi Biologics Ireland Limited, Mullagharlin Dundalk, Co. Louth

18 July 2024 · Permission.ie Planning Wire · from the Louth County Council planning register · published 1 September 2026

Louth County Council granted permission on 18 July 2024 for a wind farm grid connection works at Wuxi Biologics Ireland Limited, Mullagharlin Dundalk, an application first lodged on 15 September 2023.

Key facts

Reference
2360356
Planning authority
Louth County Council
Location
Wuxi Biologics Ireland Limited, Dundalk Science And Technology Park, Mullagharlin Dundalk
Received
15 September 2023
Application type
PERMISSION
Site area
1.2 hectares
Stated capacity
3 MW
Turbine height
80 m
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision date
18 July 2024
Appeal
ABP 320542-24 · CONDITIONAL

In context

There were 61 nationally in the past twelve months. Of the 85 such applications decided by councils in the past three years, 74% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 18 July 2024. If no appeal is lodged, the council’s decision stands and a final grant issues.

The development description, as lodged

Verbatim from the Louth County Council register. This is the source for every figure in the story above.

Permission to erect a 3MW Wind Turbine, located at the East area of our existing biopharmaceuticals plant; the Wind Turbine will be installed with a hub height of 80 meters and a blade radius of 45 meters, with underground ducting connecting to the existing ESB substation. The application relates to the development which comprises of an activity which holds an Industrial Emissions Discharge (IED) Licence (Licence No. P1122-01)

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Louth County Council grants permission for wind farm grid connection works at Wuxi Biologics Ireland Limited, Mullagharlin Dundalk, Co. Louth", 18 July 2024. https://www.permission.ie/news/louth-county-council/2360356

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/louth-county-council/2360356">Louth County Council grants permission for wind farm grid connection works at Wuxi Biologics  Ireland Limited, Mullagharlin Dundalk, Co. Louth</a>, Permission.ie analysis of the national planning register, 18 July 2024.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2360356.

All wind energy applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Louth the week it appears.

Set up alerts
Louth County Council grants permission for wind farm grid connection works at Wuxi Biologics Ireland Limited, Mullagharlin Dundalk, Co. Louth | Permission.ie