Wind energyDecisionRoscommon
Roscommon County Council grants permission for 138-turbine wind farm with 149.38m turbines at Kilcash, Co. Roscommon
3 May 2024 · Permission.ie Planning Wire · from the Roscommon County Council planning register · published 15 September 2026
Roscommon County Council granted permission on 3 May 2024 for a 138-turbine wind farm with 149.38m turbines at Kilcash, an application first lodged on 29 September 2023.
Key facts
- Reference
- 2360142
- Planning authority
- Roscommon County Council
- Location
- Kilcash, Roscommon, Co. Roscomnon.
- Received
- 29 September 2023
- Application type
- PERMISSION
- Site area
- 4.4 hectares
- Stated capacity
- 4.2 MW
- Turbines
- 138
- Turbine height
- 149.38 m
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision date
- 3 May 2024
- Appeal
- ABP-319800-24 · CONDITIONAL
In context
It is one of 2 wind energy applications Roscommon County Council has received in the past twelve months, against 63 nationally. Of the 84 such applications decided by councils in the past three years, 74% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 3 May 2024. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Roscommon County Council register. This is the source for every figure in the story above.
Permission for a development relating to the: • The construction of one Enercon E138 Wind Turbine on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m • Installation of the hardstanding area for the Wind Turbine. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c.282m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m 2 and c.5m in height; • Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. • All associated ancillary infrastructure and preparatory works such as provision of the site entrance The power rating associated with the proposed wind turbine will be 4.2 megawatts (MW). The proposed Project will have a 30-year lifespan. A Natura Impact Statement has been prepared as part of this planning application at
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Roscommon County Council grants permission for 138-turbine wind farm with 149.38m turbines at Kilcash, Co. Roscommon", 3 May 2024. https://www.permission.ie/news/roscommon-county-council/2360142
<p>Source: <a href="https://www.permission.ie/news/roscommon-county-council/2360142">Roscommon County Council grants permission for 138-turbine wind farm with 149.38m turbines at Kilcash, Co. Roscommon</a>, Permission.ie analysis of the national planning register, 3 May 2024.</p>
Map, site boundary, timeline and nearby applications for 2360142.
All wind energy applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Roscommon the week it appears.
Set up alerts