Wind energyDecisionRoscommon
Roscommon County Council grants permission for wind farm grid connection works at Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, Co. Roscommon
20 August 2026 · Permission.ie Planning Wire · from the Roscommon County Council planning register · published 1 September 2026
Roscommon County Council granted permission on 20 August 2026 for a wind farm grid connection works at Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, an application first lodged on 15 September 2025.
Key facts
- Reference
- 2560446
- Planning authority
- Roscommon County Council
- Location
- Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, County Roscommon.
- Received
- 15 September 2025
- Application type
- PERMISSION
- Site area
- 49.8 hectares
- Turbine height
- 160 m
- Status
- DECISION MADE
- Decision
- CONDITIONAL
- Decision date
- 20 August 2026
In context
It is one of 2 wind energy applications Roscommon County Council has received in the past twelve months, against 62 nationally. Of the 85 such applications decided by councils in the past three years, 74% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 20 August 2026. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Roscommon County Council register. This is the source for every figure in the story above.
Permission for development consisting of: • The construction and operation of a wind farm consisting of six wind turbines; • The turbine specification is unconfirmed but will fall within the parameter range outlined by Roscommon County Council and will be one of the following three Options; - Technology Option 1: tip height of 160m, rotor diameter of 136m and hub height of 92m; or - Technology Option 2: tip height of 156m, rotor diameter of 133m and hub height of 90m; or - Technology Option 3: tip height of 159m, rotor diameter of 138m and hub height of 90m; • Construction of turbine hardstands (including crane and assembly areas) and turbine foundations; • Construction of approximately 3.9km of new permanent internal site access tracks and the upgrade of 0.5km of existing internal site access tracks; • Construction of a permanent onsite 38kV electrical substation, including one single storey substation building with welfare facilities, Lidar, diesel generator and fuel storage tank, all associated electrical plant and equipment, all associated underground cabling, rainwater harvesting and storage tank, wastewater holding tank, security fencing, gates, signage, and all ancillary structures and works; • Installation of underground electrical and communications cabling connecting the wind turbines to the proposed onsite 38kV electrical substation; • Construction of two temporary site compounds with associated site offices, welfare facilities, car parking, site fencing and lighting; • Erection of a permanent 30m high communications relay tower; • Construction access via six site entrances (SE1 – SE6) to include: - SE1 on the R371, SE2 and SE3 on the L6018, and SE4, SE5 and SE6 on the L60498; - SE1 and SE6 are temporary and will be reinstated following construction. SE1 may be re-established if required for turbine component repair or replacement. SE2 – SE5 will be retained permanently for operational access; • Tree felling to facilitate the construction and operation of the proposed development; • Installation of approximately 5.1km of permanent underground electrical cabling for the grid connection including cabling within the public road corridor, extending from the proposed onsite 38kV electrical Substation at Ballyfeeny to end at the junction of the R371 and the Sliabh Bawn Substation Road in the townland of Tooreen; • All associated site works, including site clearance, landscaping, site drainage, s
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Roscommon County Council grants permission for wind farm grid connection works at Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, Co. Roscommon", 20 August 2026. https://www.permission.ie/news/roscommon-county-council/2560446
<p>Source: <a href="https://www.permission.ie/news/roscommon-county-council/2560446">Roscommon County Council grants permission for wind farm grid connection works at Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, Co. Roscommon</a>, Permission.ie analysis of the national planning register, 20 August 2026.</p>
Map, site boundary, timeline and nearby applications for 2560446.
All wind energy applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Roscommon the week it appears.
Set up alerts