Wind energyLodgedSligo
Wind turbine delivery route proposed at Carrownacreevy Tanrego West Abbeytown, Co. Sligo
30 June 2026 · Permission.ie Planning Wire · from the Sligo County Council planning register · published 1 September 2026
An applicant lodged plans with Sligo County Council on 30 June 2026 for a wind turbine delivery route at Carrownacreevy Tanrego West Abbeytown. The application seeks an operational life of 10 years.
Key facts
- Reference
- 2660259
- Planning authority
- Sligo County Council
- Location
- Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat, Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat, Co. Sligo
- Received
- 30 June 2026
- Application type
- PERMISSION
- Site area
- 0.5 hectares
- Operational life
- 10 years
- Status
- INCOMPLETED APPLICATION
- Submissions until
- 3 August 2026 (closed)
- Council file
- View on the Sligo County Council planning portal
In context
It is the only wind energy application Sligo County Council has received in the past twelve months, against 61 nationally. Of the 85 such applications decided by councils in the past three years, 74% were granted.
What happens next
The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Sligo County Council register. This is the source for every figure in the story above.
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Sligo is 0.49 Hectares (Ha). The proposed development within the Sligo County bounds comprises both temporary and permanent works located in the townlands of Carrownacreevy, Tanrego West, Abbeytown, Corhawnagh and Carricknagat. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 1No. location. • Temporary removal of one traffic signal, three road signs, one bollard, one pole, a bridge railing, pedestrian guardrail and wall.at 1 No. location • Temporary removal of a wall, fence, poles and vegetation at 1No. location. • Construction of a permanent slip road linking the N4 and R290 at Carricknagat. • Removal of rock outcrop at Carricknagat including trees and vegetation clearance. Laying of a load bearing surface including associated drainage and reinstatement works. • Installation of temporary construction compound at Carricknagat to include site offices, welfare facilities and car parking. • Reinstatement of all temporary works areas to previous condition. • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications will be made to both Donegal and Mayo County Councils in respect of works required at locations within each county bounds. Minor, temporary works in Donegal are proposed at Killybegs, Glebe, Aghayeevoge, Cashelreagh Glebe, Bruckless, Aighan, Bruckless and Darney. Minor, temporary works in Mayo are proposed at Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. Permanent works are proposed at Crossmolina. An Appropriate Assessment Screening Report (AASR
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Wind turbine delivery route proposed at Carrownacreevy Tanrego West Abbeytown, Co. Sligo", 30 June 2026. https://www.permission.ie/news/sligo-county-council/2660259
<p>Source: <a href="https://www.permission.ie/news/sligo-county-council/2660259">Wind turbine delivery route proposed at Carrownacreevy Tanrego West Abbeytown, Co. Sligo</a>, Permission.ie analysis of the national planning register, 30 June 2026.</p>
Map, site boundary, timeline and nearby applications for 2660259.
All wind energy applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Sligo the week it appears.
Set up alerts