← Planning Wire · South Dublin County Council news

Solar farmsDecisionDublin

South Dublin County Council grants permission for 6.4-hectare solar farm at Saggart, Co. Dublin

10 January 2024 · Permission.ie Planning Wire · from the South Dublin County Council planning register · published 15 September 2026

South Dublin County Council granted permission on 10 January 2024 for a 6.4-hectare solar farm at Saggart, an application first lodged on 5 December 2023.

Key facts

Reference
SD23A/0100
Planning authority
South Dublin County Council
Location
Land at Citywest Hotel and Convention Centre, Saggart, Co. Dublin
Received
5 December 2023
Application type
Permission
Site area
6.4 hectares
Status
Final Grant
Decision
Grant Permission
Decision date
10 January 2024

In context

It is one of 13 solar farm applications South Dublin County Council has received in the past twelve months, against 351 nationally. Of the 572 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 10 January 2024. If no appeal is lodged, the council’s decision stands and a final grant issues.

The development description, as lodged

Verbatim from the South Dublin County Council register. This is the source for every figure in the story above.

Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "South Dublin County Council grants permission for 6.4-hectare solar farm at Saggart, Co. Dublin", 10 January 2024. https://www.permission.ie/news/south-dublin-county-council/SD23A%2F0100

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/south-dublin-county-council/SD23A%2F0100">South Dublin County Council grants permission for 6.4-hectare solar farm at Saggart, Co. Dublin</a>, Permission.ie analysis of the national planning register, 10 January 2024.</p>
Full application record

Map, site boundary, timeline and nearby applications for SD23A/0100.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Dublin the week it appears.

Set up alerts