Solar farmsDecisionDublin
South Dublin County Council grants permission for 6.4-hectare solar farm at Saggart, Co. Dublin
10 January 2024 · Permission.ie Planning Wire · from the South Dublin County Council planning register · published 15 September 2026
South Dublin County Council granted permission on 10 January 2024 for a 6.4-hectare solar farm at Saggart, an application first lodged on 5 December 2023.
Key facts
- Reference
- SD23A/0100
- Planning authority
- South Dublin County Council
- Location
- Land at Citywest Hotel and Convention Centre, Saggart, Co. Dublin
- Received
- 5 December 2023
- Application type
- Permission
- Site area
- 6.4 hectares
- Status
- Final Grant
- Decision
- Grant Permission
- Decision date
- 10 January 2024
In context
It is one of 13 solar farm applications South Dublin County Council has received in the past twelve months, against 351 nationally. Of the 572 such applications decided by councils in the past three years, 92% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 10 January 2024. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the South Dublin County Council register. This is the source for every figure in the story above.
Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "South Dublin County Council grants permission for 6.4-hectare solar farm at Saggart, Co. Dublin", 10 January 2024. https://www.permission.ie/news/south-dublin-county-council/SD23A%2F0100
<p>Source: <a href="https://www.permission.ie/news/south-dublin-county-council/SD23A%2F0100">South Dublin County Council grants permission for 6.4-hectare solar farm at Saggart, Co. Dublin</a>, Permission.ie analysis of the national planning register, 10 January 2024.</p>
Map, site boundary, timeline and nearby applications for SD23A/0100.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Dublin the week it appears.
Set up alerts