Wind energyDecisionTipperary

Tipperary County Council refuses permission for wind turbine delivery route at Cloncorig Killeen and Cornhill, Co. Tipperary

16 November 2023 · Permission.ie Planning Wire · from the Tipperary County Council planning register · published 15 September 2026

Tipperary County Council refused permission on 16 November 2023 for a wind turbine delivery route at Cloncorig Killeen and Cornhill, an application first lodged on 22 September 2023.

Key facts

Reference
2360763
Planning authority
Tipperary County Council
Location
In the townlands of Croghan Clohaskin Caherhoereigh Ballykinash Tinnakilly Arragh More Ballyloughnane Faddan Beg Coolderry, Tinlough Sharragh Doughkill Ballaghgar Faddan More, Cloncorig Killeen and Cornhill Co. Tipperary
Received
22 September 2023
Application type
PERMISSION
Site area
78.9 hectares
Turbines
7
Turbine height
107 m
Status
APPLICATION FINALISED
Decision
REFUSED
Decision date
16 November 2023
Appeal
ABP-318689-23 · CONDITIONAL

In context

It is one of 3 wind energy applications Tipperary County Council has received in the past twelve months, against 60 nationally. Of the 84 such applications decided by councils in the past three years, 74% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 16 November 2023. If no appeal is lodged, the council’s decision stands and a final grant issues.

The development description, as lodged

Verbatim from the Tipperary County Council register. This is the source for every figure in the story above.

(1) The construction of 7 no. wind turbines and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated with the connection of the proposed wind farm to the national electricity grid, via the provision of underground electrical cabling (38kV) to the existing Dallow 110kV substation in the townland of Clondallow, Co. Offaly; (4) Provision of 10 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (5) reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; (6) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (7) 1 no. meteorological mast with a height of 107m above ground and associated foundation and hard-standing area; (8) upgrade of existing tracks and roads and the provision of new site access roads; (9) all works associated with the provision of a new permanent site entrance off the L5040 local road; (10) provision of 5 no. new access and egress points along the L5041 local road in the townlands of Cloncorig, Faddan More and Coolderry; (11) Provision of 4 no. peat repository areas and 3 no. spoil repository areas; (12) 2 no. temporary construction compounds with temporary site offices and staff facilities; (13) Accommodation works along the public road network along the N52 national secondary road in the townland of Ballyloughnane to facilitate the delivery of turbine components and other abnormal sized loads; (14) Site Drainage; (15) Tree Felling; (16) Operational stage site signage; and, (17) all associated site development works, ancillary works and apparatus. - Works within the curtilage of Protected Structures RPS Ref. TRPS336 (Ballyloughnane Bridge) and RPS Ref. TRPS519 (Croghan Bridge)

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Tipperary County Council refuses permission for wind turbine delivery route at Cloncorig Killeen and Cornhill, Co. Tipperary", 16 November 2023. https://www.permission.ie/news/tipperary-county-council/2360763

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/tipperary-county-council/2360763">Tipperary County Council refuses permission for wind turbine delivery route at Cloncorig Killeen and Cornhill, Co. Tipperary</a>, Permission.ie analysis of the national planning register, 16 November 2023.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2360763.

All wind energy applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Tipperary the week it appears.

Set up alerts