Solar farmsLodgedTipperary
2.1-hectare solar farm proposed at Newport College, Black Road Newport, Co. Tipperary
24 April 2025 · Permission.ie Planning Wire · from the Tipperary County Council planning register · published 1 September 2026
An applicant lodged plans with Tipperary County Council on 24 April 2025 for a 2.1-hectare solar farm at Newport College, Black Road Newport.
Key facts
- Reference
- 2560356
- Planning authority
- Tipperary County Council
- Location
- Newport College, Black Road Newport, Co. Tipperary
- Received
- 24 April 2025
- Application type
- PERMISSION
- Site area
- 2.1 hectares
- Status
- INCOMPLETED APPLICATION
- Submissions until
- 28 May 2025 (closed)
In context
It is one of 20 solar farm applications Tipperary County Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Tipperary County Council register. This is the source for every figure in the story above.
construction of a 1, 2 & 3 Storey extension with a total floor area of 3,508m² comprising: 13 no. classrooms, 8 no. specialist Classrooms, 1 no. SET Room, a 2 Classroom SEN Unit with direct access to own outdoor play area & Sensory Garden, all necessary ancillary spaces, the installation of roof mounted Solar PV Panels, ASHP, 2 no. Static Water Storage Tanks (below ground), the demolition of 1 no. Lean-to Store(34m²) & 1 no single storey Prefab (162m²), the removal of a 1&2 storey Prefabricated Classroom Block (1,042m²) together with Site works comprising: alterations to lower the existing front boundary wall(for the extent of the proposed extension) and formation of a new Pedestrian Entrance, adjustments to the existing Staff Car Parking Layout and the addition of New Car & Bicycle parking (with shelter) to the front of the existing Main School Building, all associated drainage & Site development works, and improvements to the 2no. existing Vehicular Entrances onto Black Road along with the provision of a Temporary Construction Access onto the Black Road
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "2.1-hectare solar farm proposed at Newport College, Black Road Newport, Co. Tipperary", 24 April 2025. https://www.permission.ie/news/tipperary-county-council/2560356
<p>Source: <a href="https://www.permission.ie/news/tipperary-county-council/2560356">2.1-hectare solar farm proposed at Newport College, Black Road Newport, Co. Tipperary</a>, Permission.ie analysis of the national planning register, 24 April 2025.</p>
Map, site boundary, timeline and nearby applications for 2560356.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Tipperary the week it appears.
Set up alerts