← Planning Wire

Solar farmsDecisionTipperary

Tipperary County Council grants permission for 4.4-hectare solar farm at Grangemockler, Co. Tipperary

7 August 2025 · Permission.ie Planning Wire · from the Tipperary County Council planning register · published 1 September 2026

Tipperary County Council granted permission on 7 August 2025 for a 4.4-hectare solar farm at Grangemockler, an application first lodged on 17 June 2025.

Key facts

Reference
2560566
Planning authority
Tipperary County Council
Location
Townlands of Grangemockler Currasilla Lower and Bleenaleen Lower, Grangemockler, County Tipperary
Received
17 June 2025
Application type
PERMISSION
Site area
4.4 hectares
Permission sought
10 years
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision date
7 August 2025
Appeal
ACP-323526-25 · CONDITIONAL

In context

It is one of 20 solar farm applications Tipperary County Council has received in the past twelve months, against 335 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 7 August 2025. If no appeal is lodged, the council’s decision stands and a final grant issues. The applicant sought a 10-year permission, which sets how long they have to start the development.

The development description, as lodged

Verbatim from the Tipperary County Council register. This is the source for every figure in the story above.

10-year permission. The development will consist of (1) Integrated Constructed Wetland (ICW) type Wastewater Treatment Plant (WWTP) for the treatment of wastewater from the Grangemockler agglomeration comprising of 1 No. septic tank and 4No. ICW ponds; (2) Provision of a new terminal wastewater pumping station and stormwater management at the site of the existing Slievardagh Estate Developer Provided Infrastructure (DPI) WWTP, which is to be decommissioned; (3) Access road surrounding the ICW ponds; (4) decommissioning of 2 existing septic tanks (Mill River and Lingaun Park); (5) Ancillary works associated with the development including the associated pipework, fencing and landscaping; (6) pedestrian access via new footbridge over the Currasilla Stream; (7) upgrade existing culvert bridge under existing access road; (8) the installation of a ground mounted solar photovoltaic (PV) array. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Tipperary County Council grants permission for 4.4-hectare solar farm at Grangemockler, Co. Tipperary", 7 August 2025. https://www.permission.ie/news/tipperary-county-council/2560566

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/tipperary-county-council/2560566">Tipperary County Council grants permission for 4.4-hectare solar farm at Grangemockler, Co. Tipperary</a>, Permission.ie analysis of the national planning register, 7 August 2025.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2560566.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Tipperary the week it appears.

Set up alerts