← Planning Wire · Tipperary County Council news

Solar farmsLodgedTipperary

6.9-hectare solar farm proposed at Lisbrien, Nenagh, Co. Tipperary

15 September 2026 · Permission.ie Planning Wire · from the Tipperary County Council planning register · published 22 September 2026

An applicant lodged plans with Tipperary County Council on 15 September 2026 for a 6.9-hectare solar farm at Lisbrien, Nenagh. The application seeks a 10-year permission and an operational life of 40 years. Submissions from the public can be made until 19 October 2026, and a decision is due by 9 November 2026.

Key facts

Reference
2660902
Planning authority
Tipperary County Council
Location
Lisbrien, Nenagh, Tipperary
Received
15 September 2026
Application type
PERMISSION
Site area
6.9 hectares
Permission sought
10 years
Operational life
40 years
Status
PRE_VALIDATION
Decision due
9 November 2026
Submissions until
19 October 2026

In context

It is one of 20 solar farm applications Tipperary County Council has received in the past twelve months, against 350 nationally. Of the 570 such applications decided by councils in the past three years, 92% were granted.

What happens next

Anyone can make a submission or observation to Tipperary County Council until 19 October 2026, for a fee of €20. Only those who make a submission can later appeal the decision. The council is due to decide by 9 November 2026, unless it requests further information, which stops the clock.

How to make a submission

The development description, as lodged

Verbatim from the Tipperary County Council register. This is the source for every figure in the story above.

permission for development on lands in the townland of Lisbrien, Co. Tipperary (the Proposed Development) which comprises a renewable energy development as defined by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The application seeks a 10-year permission with an operational lifetime of 40 years. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares. The application comprises the following – i. Construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units. iii. 4 no. electrical invertor units. iv. Use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area. v. 2 no. control cabins. vi. 33kV connector cable network, joint bays and associated works. vii. Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works. viii. The decommissioning of the solar farm and reinstatement of the site at the end of its operational life. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2026 shall apply.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "6.9-hectare solar farm proposed at Lisbrien, Nenagh, Co. Tipperary", 15 September 2026. https://www.permission.ie/news/tipperary-county-council/2660902

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/tipperary-county-council/2660902">6.9-hectare solar farm proposed at Lisbrien, Nenagh, Co. Tipperary</a>, Permission.ie analysis of the national planning register, 15 September 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2660902.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Tipperary the week it appears.

Set up alerts