Solar farmsLodgedWestmeath
2.4-hectare solar farm proposed at Corcloon, Co. Westmeath
16 March 2026 · Permission.ie Planning Wire · from the Westmeath County Council planning register · published 1 September 2026
An applicant lodged plans with Westmeath County Council on 16 March 2026 for a 2.4-hectare solar farm at Corcloon. The application seeks a 10-year permission.
Key facts
- Reference
- 2660122
- Planning authority
- Westmeath County Council
- Location
- Millview Housing Estate at Milltownpass, Corcloon Townland, County Westmeath Ireland
- Received
- 16 March 2026
- Application type
- PERMISSION
- Site area
- 2.4 hectares
- Permission sought
- 10 years
- Status
- FURTHER INFORMATION
- Submissions until
- 19 April 2026 (closed)
In context
It is one of 7 solar farm applications Westmeath County Council has received in the past twelve months, against 337 nationally. Of the 573 such applications decided by councils in the past three years, 92% were granted.
What happens next
The five-week window for public submissions has closed. The council normally decides within eight weeks of the application being lodged, unless it requests further information, which stops the clock.
The development description, as lodged
Verbatim from the Westmeath County Council register. This is the source for every figure in the story above.
This application is seeking a 10-year permission. The development will consist of: (1) Provision of Constructed Wetland (CW) type Wastewater Treatment Plant (WWTP) for the treatment of wastewater from the Millview Housing Estate comprising 1 no. septic tank and 3 no. CW ponds; (2) Decommission of the existing Millview WWTP; (3) Provision of a new terminal Wastewater Pumping Station (WWPS) and stormwater management at the site adjacent to the existing Millview WWTP; (4) Construction of maintenance road surrounding the CW ponds and connecting the existing and proposed WWTPs; (5) Installation of a ground-mounted solar photovoltaic (PV) array; (6) Ancillary works associated with the development including the associated pipework, fencing, and landscaping. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "2.4-hectare solar farm proposed at Corcloon, Co. Westmeath", 16 March 2026. https://www.permission.ie/news/westmeath-county-council/2660122
<p>Source: <a href="https://www.permission.ie/news/westmeath-county-council/2660122">2.4-hectare solar farm proposed at Corcloon, Co. Westmeath</a>, Permission.ie analysis of the national planning register, 16 March 2026.</p>
Map, site boundary, timeline and nearby applications for 2660122.
All solar farms applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Westmeath the week it appears.
Set up alerts