← Planning Wire

Wind energyDecisionWicklow

Wicklow County Council grants permission for 6-turbine wind farm with 131m turbines at Ballycumber North and Ballycumber, Co. Wicklow

13 August 2026 · Permission.ie Planning Wire · from the Wicklow County Council planning register · published 1 September 2026

Wicklow County Council granted permission on 13 August 2026 for a 6-turbine wind farm with 131m turbines at Ballycumber North and Ballycumber, an application first lodged on 5 June 2026.

Key facts

Reference
2660498
Planning authority
Wicklow County Council
Location
Ballycumber North and Ballycumber South,, Co. Wicklow
Received
5 June 2026
Application type
PERMISSION
Site area
11.5 hectares
Turbines
6
Turbine height
131 m
Status
DECISION MADE
Decision
CONDITIONAL
Decision date
13 August 2026

In context

It is one of 2 wind energy applications Wicklow County Council has received in the past twelve months, against 62 nationally. Of the 85 such applications decided by councils in the past three years, 74% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 13 August 2026. If no appeal is lodged, the council’s decision stands and a final grant issues.

The development description, as lodged

Verbatim from the Wicklow County Council register. This is the source for every figure in the story above.

RED III Category 1 - extension of the operational life of the Ballycumber wind farm located in the townlands of Ballycumber North and Ballycumber South, County Wicklow. the development of which the operational life will be extended, consists of • 6 wind turbines with an overall tip height of 131m • anemometry mast • site access tracks • hard standing areas • electrical control building and compound • underground cabling.• ancillary works including drainage, the planning application is for an extension to the operational life of the Ballycumber Wind Farm for a further 15 years from 25 years as granted under An Coimisiún Pleanála reference PL27.241827 Wicklow County Council Pl. Ref. 13/8043 (which replaced the previous permission for a wind farm on the site granted under PL 27.236261, Wicklow County Council Pl. Ref. 09/704), to 40 year

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Wicklow County Council grants permission for 6-turbine wind farm with 131m turbines at Ballycumber North and Ballycumber, Co. Wicklow", 13 August 2026. https://www.permission.ie/news/wicklow-county-council/2660498

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/wicklow-county-council/2660498">Wicklow County Council grants permission for 6-turbine wind farm with 131m turbines at Ballycumber North and Ballycumber, Co. Wicklow</a>, Permission.ie analysis of the national planning register, 13 August 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2660498.

All wind energy applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Wicklow the week it appears.

Set up alerts