← Planning Wire · Wicklow County Council news

Solar farmsDecisionWicklow

Wicklow County Council grants permission for 6.3-hectare solar farm at Vartry Waterworks, Roundwood Oldtown, Co. Wicklow

30 October 2026 · Permission.ie Planning Wire · from the Wicklow County Council planning register · published 17 November 2026

Wicklow County Council granted permission on 30 October 2026 for a 6.3-hectare solar farm at Vartry Waterworks, Roundwood Oldtown, an application first lodged on 17 September 2026.

Key facts

Reference
2660840
Planning authority
Wicklow County Council
Location
Vartry Waterworks, Roundwood Oldtown, Knockfadda Newastle Upper
Received
17 September 2026
Application type
PERMISSION
Site area
6.3 hectares
Permission sought
10 years
Status
DECISION MADE
Decision
CONDITIONAL
Decision date
30 October 2026

In context

It is one of 12 solar farm applications Wicklow County Council has received in the past twelve months, against 337 nationally. Of the 558 such applications decided by councils in the past three years, 92% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 30 October 2026. If no appeal is lodged, the council’s decision stands and a final grant issues. The applicant sought a 10-year permission, which sets how long they have to start the development.

The development description, as lodged

Verbatim from the Wicklow County Council register. This is the source for every figure in the story above.

10-year planning permission for the Vartry Security of supply project at the existing Vartry waterworks site south of the Vartry reservoir in the townlands of Roundwood in the electoral division of Oldtown, and Knockfadda in the electoral division of Newcastle Upper, County Wicklow, the proposed development consists of, i) 60 megalitres treated water storage in two new 30 megalitres capacity structures, ii) a new underground dichlorination chamber, iii) a permanent pre-cast concrete bridge over the Vartry River on existing bridge abutments, iv) solar photovoltaic panels installation on both reservoir roof areas, v) a temporary storage area for excavated material, vi) ancillary works including, a. water supply pipes, b. surface water drainage, c. temporary lighting during the construction stage only, d. temporary compound area for the construction period, e. hardstanding adjacent to the existing Callowhill Pumphouse, f. extension of internal access road to the inlet / outlet chamber of the reservoirs and, g. associated landscaping works

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Wicklow County Council grants permission for 6.3-hectare solar farm at Vartry Waterworks, Roundwood Oldtown, Co. Wicklow", 30 October 2026. https://www.permission.ie/news/wicklow-county-council/2660840

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/wicklow-county-council/2660840">Wicklow County Council grants permission for 6.3-hectare solar farm at Vartry Waterworks, Roundwood Oldtown, Co. Wicklow</a>, Permission.ie analysis of the national planning register, 30 October 2026.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2660840.

All solar farms applications

The full register view, with a map and decision statistics.

Get stories like this the day they are lodged

A county watch emails you every new application in Wicklow the week it appears.

Set up alerts