Application Timeline
Application received
4 Aug 2000
Decision: REFUSED
21 Sept 2000
Decision due
4 Oct 2000
Application Details
- Location
- SITE NO. 3, SITE NO. 3, MAULATANVALLY,
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 4 August 2000
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 21 September 2000
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwellinghouse
SITE NO. 1, SITE NO. 1, MAULATANVALLY,
1) Retention of conversion of attic of dwelling to residential accommodation including installation of rooflights and of a detached storage outbuilding to front of dwelling and 2) Replace two rooflights of the dwelling with larger escape rooflights to rear elevation
Maulatanvally Reanascreena Co. Cork
Dwellinghouse
SITE NO. 2, SITE NO. 2, MAULATANVALLY,
Dwelling
SITE NO 2, MAULATANVALLY,
Dwellinghouse and carry out associated site works
Maulatanvally Reenascreena
Dwelling
MAULATANVALLY, MAULATANVALLY,
A cemetery incorporating an altar with life size crucifix and related statuary, an ancillary car park, a memorial garden, a site entrance area incorporating life size statuary and a notice board and all associated works to serve a religious community
St. Finbar's Priory Maulatanvally Drinagh Co. Cork
Change of use of part of an existing farm-holding from agricultural use to religious community use, the completion of the demolition of an existing agricultural outbuilding, the erection of a chapel building encompassing the footprint of said agricultural building, the installation of a wastewater treatment system and car parking facilities and the carrying out all associated works
St. Finbar's Priory Maulatanvally Drinagh Co. Cork
Dwellinghouse
SITE NO. 4, SITE NO. 4, MAULATANVALLY,
Construction of a two turbine extension to an existing four turbine wind farm at the townlands of Coomatallin, Kippagh and The Pike near Drinagh, Co. Cork. The maximum hub height will be 65m and the maximum rotor diameter will be 82.5m resulting in a maximum tip height of 106.25m. The associated works will include turbine foundations and hardstanding, transformers, access track, drainage and an extension to the existing substation
Townlands of Coomatallin, Kippagh and The Pike, Drinagh, Co. Cork