Proposed Development
1) Retention of conversion of attic of dwelling to residential accommodation including installation of rooflights and of a detached storage outbuilding to front of dwelling and 2) Replace two rooflights of the dwelling with larger escape rooflights to rear elevation
View the full application file on the council's planning portal →Application Timeline
Application received
19 Aug 2022
Decision: CONDITIONAL
11 Oct 2022
Decision due
13 Oct 2022
Grant issued
14 Nov 2022
Application Details
- Location
- Maulatanvally Reanascreena Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 19 August 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 October 2022
- Grant Date
- 14 November 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwellinghouse
SITE NO. 2, SITE NO. 2, MAULATANVALLY,
Dwelling
SITE NO 2, MAULATANVALLY,
Dwellinghouse
SITE NO. 1, SITE NO. 1, MAULATANVALLY,
Dwellinghouse
SITE NO. 3, SITE NO. 3, MAULATANVALLY,
A cemetery incorporating an altar with life size crucifix and related statuary, an ancillary car park, a memorial garden, a site entrance area incorporating life size statuary and a notice board and all associated works to serve a religious community
St. Finbar's Priory Maulatanvally Drinagh Co. Cork
Change of use of part of an existing farm-holding from agricultural use to religious community use, the completion of the demolition of an existing agricultural outbuilding, the erection of a chapel building encompassing the footprint of said agricultural building, the installation of a wastewater treatment system and car parking facilities and the carrying out all associated works
St. Finbar's Priory Maulatanvally Drinagh Co. Cork
Dwelling
MAULATANVALLY, MAULATANVALLY,
Dwellinghouse and carry out associated site works
Maulatanvally Reenascreena
Dwellinghouse
SITE NO. 4, SITE NO. 4, MAULATANVALLY,
Construction of a two turbine extension to an existing four turbine wind farm at the townlands of Coomatallin, Kippagh and The Pike near Drinagh, Co. Cork. The maximum hub height will be 65m and the maximum rotor diameter will be 82.5m resulting in a maximum tip height of 106.25m. The associated works will include turbine foundations and hardstanding, transformers, access track, drainage and an extension to the existing substation
Townlands of Coomatallin, Kippagh and The Pike, Drinagh, Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?