Proposed Development
Construction of sunroom extension to dwellinghouse
Application Timeline
Application received
19 Dec 2003
Decision: CONDITIONAL
17 Feb 2004
Decision due
21 Feb 2004
Grant issued
24 Mar 2004
Application Details
- Location
- 1 The Spires Carrignafoy Cobh
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 19 December 2003
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 17 February 2004
- Grant Date
- 24 March 2004
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of entrance boundary wall
The spires Carrignafoy Cobh Co. Cork
Construction of two storey extension to dwellinghouse
No.18, The Drive College Manor Carrignafoy Cobh
Construction of two storey extension to dwellinghouse
No.18, The Drive College Manor Carrignafoy Cobh
A) (i) Construction of a two-storey extension to the side (east) of existing dwellinghouse and associated site works, (ii) insert a velux rooflight to front roof of existing dwellinghouse. B) Retention of the existing single-storey sunroom extension located at the rear of dwellinghouse.
22 College Drive College Manor Carrignafoy Cobh, Co. Cork
(a) Construction of a single storey kitchen extension and installation of 2 no. rooflights to the ground floor dining room at the rear (north) of dwelling house together with a new external side door to the ground floor utility room, (b) construction of a first floor extension to the side (east) incorporating part use of the attic space as a walk-in wardrobe with a rooflight to the front (south), (c) conversion of existing attic space to provide bedroom and en-suite accommodation with a dormer window and rooflight to both the front and rear, together with all associated alterations and site works
18 The Spires Carrignafoy Cobh Co. Cork
Construction of ground floor side extension, first floor extension and all associated site works
112 The Spires Carrignafoy Cobh
Construction of ground floor side extension, first floor extension to dwellinghouse and all associated site works
112 The Spires Carrignafoy Cobh
A) Permission to construct a single storey extension to the front (West) elevation, B) Retention Permission for the as built existing single storey rear extension (37.9m²). *Note: Rear extension was previously granted Permission under PL. Reg. No. 21/05915, but this existing extension at the time was built bigger, the parapet overhang was revised and some ope revisions to the rear and side (South) elevations of existing dwelling.
No.112 The Spires Carrignafoy Cobh Co. Cork
i) Removal of hipped roof over existing rear single storey annex, ii) Construction of a single storey flat roof extension (22.75m2) with parapet wall at the rear (east) elevation of existing dwellinghouse, iii) Insert 1no. window on ground floor to side (south) wall of existing rear annex, and iv) All associated site works.
No.112 The Spires Carrignafoy Cobh Co. Cork
Extension to dwellinghouse
14 The Spires Carrignafoy Cobh
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?