← Back to search

1 The Spires Carrignafoy Cobh

CONDITIONAL

Planning application 03/6621

Cork - Cork County Council

Proposed Development

Construction of sunroom extension to dwellinghouse

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2003

  2. Decision: CONDITIONAL

    17 Feb 2004

  3. Decision due

    21 Feb 2004

  4. Grant issued

    24 Mar 2004

Application Details

Location
1 The Spires Carrignafoy Cobh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
19 December 2003
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 February 2004
Grant Date
24 March 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

42m
03/5902REFUSED12 Nov 2003

Retention of entrance boundary wall

The spires Carrignafoy Cobh Co. Cork

63m
08/4189INCOMPLETED APPLICATION17 Jan 2008

Construction of two storey extension to dwellinghouse

No.18, The Drive College Manor Carrignafoy Cobh

63m
08/4679REFUSED11 Feb 2008

Construction of two storey extension to dwellinghouse

No.18, The Drive College Manor Carrignafoy Cobh

99m
19/6541CONDITIONAL23 Oct 2019

A) (i) Construction of a two-storey extension to the side (east) of existing dwellinghouse and associated site works, (ii) insert a velux rooflight to front roof of existing dwellinghouse. B) Retention of the existing single-storey sunroom extension located at the rear of dwellinghouse.

22 College Drive College Manor Carrignafoy Cobh, Co. Cork

107m
15/6875CONDITIONAL17 Dec 2015

(a) Construction of a single storey kitchen extension and installation of 2 no. rooflights to the ground floor dining room at the rear (north) of dwelling house together with a new external side door to the ground floor utility room, (b) construction of a first floor extension to the side (east) incorporating part use of the attic space as a walk-in wardrobe with a rooflight to the front (south), (c) conversion of existing attic space to provide bedroom and en-suite accommodation with a dormer window and rooflight to both the front and rear, together with all associated alterations and site works

18 The Spires Carrignafoy Cobh Co. Cork

109m
11/5476INCOMPLETED APPLICATION8 Jul 2011

Construction of ground floor side extension, first floor extension and all associated site works

112 The Spires Carrignafoy Cobh

109m
11/5591CONDITIONAL22 Jul 2011

Construction of ground floor side extension, first floor extension to dwellinghouse and all associated site works

112 The Spires Carrignafoy Cobh

110m
25/5326Conditional Permission4 Jul 2025

A) Permission to construct a single storey extension to the front (West) elevation, B) Retention Permission for the as built existing single storey rear extension (37.9m²). *Note: Rear extension was previously granted Permission under PL. Reg. No. 21/05915, but this existing extension at the time was built bigger, the parapet overhang was revised and some ope revisions to the rear and side (South) elevations of existing dwelling.

No.112 The Spires Carrignafoy Cobh Co. Cork

110m
21/5915CONDITIONAL9 Jul 2021

i) Removal of hipped roof over existing rear single storey annex, ii) Construction of a single storey flat roof extension (22.75m2) with parapet wall at the rear (east) elevation of existing dwellinghouse, iii) Insert 1no. window on ground floor to side (south) wall of existing rear annex, and iv) All associated site works.

No.112 The Spires Carrignafoy Cobh Co. Cork

111m
06/6599INCOMPLETED APPLICATION24 Apr 2006

Extension to dwellinghouse

14 The Spires Carrignafoy Cobh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?