← Back to search

Ballynoran Ballyhea

CONDITIONAL

Planning application 05/471

Cork - Cork County Council

Application Timeline

  1. Application received

    1 Feb 2005

  2. Decision due

    28 Mar 2005

  3. Decision: CONDITIONAL

    29 Mar 2005

  4. Grant issued

    4 May 2005

Application Details

Location
Ballynoran Ballyhea
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
1 February 2005Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 March 2005
Grant Date
4 May 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

265m
23/6099CONDITIONAL17 Oct 2023

The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.

Fiddane, Cooliney Coolcaum, Ballynoran, Ballynadrideen Ardnageehy, Charleville Co. Cork

324m
17/4460CONDITIONAL1 Mar 2017

Retention of extension and alterations to existing cottage and all associated site works-This application involves a protected/listed structure.

Ballynoran Ballyhea Co.Cork

393m
19/6333REFUSED25 Sept 2019

To construct a dwelling and all associated site works.

Ballynoran Td. Ballyhea Co. Cork

409m
25/4091REFUSED28 Jan 2025

Permission to construct a single storey dwelling house and detached garage for domestic usage and all associated site works

Ballynoran Ballyhea Co.Cork

411m
25/5868Application Withdrawn10 Sept 2025

Permission to construct a single storey dwelling house and detached garage for domestic usage and all associated site works.

Ballynoran, Ballyhea, Co. Cork

517m
03/2546CONDITIONAL28 May 2003

Bungalow

BALLYNORAN, BALLYNORAN,

668m
22/6889CONDITIONAL23 Dec 2022

Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwelling

Coolcaum Churchtown Mallow Co.Cork

712m
15/4171WITHDRAWN2 Feb 2015

The removal of condition no. 20 of planning permission granted under planning reference number 14/4817. This condition is in relation to maintenance of hedging and grass margin on the opposite roadside boundary to proposed vehicular entrance

Ballynoran Ballyhea Charleville, Co Cork

717m
14/4817CONDITIONAL23 Apr 2014

Construction of dwellinghouse, alterations to existing entrance of adjoining to form double entrance, waste water treatment system and all associated site works

Ballynoran Ballyhea Charleville

717m
14/4708INCOMPLETED APPLICATION8 Apr 2014

Construction of dwelling house, waste water treatment system and all associated site works

Ballynoran Ballyhea Charleville

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?