Coolcaum Churchtown Mallow Co.Cork

CONDITIONAL

Planning application 22/6889

Cork - Cork County Council

Proposed Development

Retention of

  1. (i)
    conversion of attic of existing dwelling to storage area including roof lights and gable window
  2. (ii)
    elevational alterations to existing dwelling
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2022

  2. Decision due

    27 Feb 2023

  3. Decision: CONDITIONAL

    27 Feb 2023

  4. Grant issued

    5 May 2023

Application Details

Location
Coolcaum Churchtown Mallow Co.Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
23 December 2022Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 February 2023
Grant Date
5 May 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
21/5390CONDITIONAL20 May 2021

To construct a new garden equipment storage shed with all associated site and ancillary works.

Coolcaum Churchtown Mallow Co. Cork

4m
25/5110Conditional Permission9 Jun 2025

Permission to alter existing dwelling house, to include alterations to elevations of existing dwelling house, new dormer windows and an enclosed front porch, extension to the existing detached garage, provision of renewable energy type roof panels to the detached garage roof, modifications to the existing vehicular entrance, construction of a front boundary masonry blockwork wall to replace existing front boundary fence line and permission for retention of the location of the existing bored water well.

Coolcaum Churchtown Mallow Co. Cork, P51TR63

4m
25/4961INCOMPLETED APPLICATION21 May 2025

Permission to alter existing dwelling house, extension to the existing detached garage, provision of renewable energy type roof panels to the detached garage roof, modifications to the existing vehicular entrance, construction of a front boundary masonry blockwork wall to replace existing front boundary fence line and permission for retention of the location of the existing bored well.

Coolcaum Churchtown Mallow Co. Cork

13m
03/1545CONDITIONAL4 Apr 2003

Bungalow & garage

COOLCAUM, COOLCAUM,

39m
06/5467CONDITIONAL13 Mar 2006

Dwelling

Coolcaum Churchtown Mallow

55m
22/6288CONDITIONAL11 Oct 2022

Permission for retention of unauthorised developments consisting of the following : (a) dwelling and entrances as constructed including ancillary works, (b) stables, fowl house and agricultural machinery shed together with vehicular entrance, (c) straw and hay shed, (d) domestic garage and associated site works

Coolcaum Churchtown Mallow Co.Cork

56m
16/6832REFUSED14 Nov 2016

To fit two velux roof windows to front roof of existing dwellinghouse, construction of domestic garage/store, hay and straw store and workshop

Coolcaum Churchtown Co. Cork

515m
22/5933Conditional Permission13 Sept 2022

The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyroe solar farm (pl/ref. 20/04041), co.Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe solar farm (pl.Ref 20/04041), co.Cork. The cables will be under public road and private lands. The location of the proposed development is in the townlands of Fiddane, Cooliney, Ballynoran, Coolcaum, and Ballyroe near Charleville. A Natura Impact Statement will be submitted to the planning authority with this application.

The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.

515m
22/5777INCOMPLETED APPLICATION28 Jul 2022

The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. Ref. 17/05799 & ABP-308846-20) to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork. The cables will be under public road and private lands. A Natura Impact Statement will be submitted to the Planning Authority with this application.

Fiddane, Cooliney, Ballynoran, Coolcaum Ballyroe, Charleville Co. Cork

668m
05/471CONDITIONAL1 Feb 2005

Garage

Ballynoran Ballyhea