The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork

Conditional Permission

Planning application 22/5933

Cork - Cork County Council

Proposed Development

The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyroe solar farm (pl/ref. 20/04041), co.Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe solar farm (pl.Ref 20/04041), co.Cork. The cables will be under public road and private lands. The location of the proposed development is in the townlands of Fiddane, Cooliney, Ballynoran, Coolcaum, and Ballyroe near Charleville. A Natura Impact Statement will be submitted to the planning authority with this application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Sept 2022

  2. Decision due

    15 Jun 2023

  3. Decision: Conditional Permission

    15 Jun 2023

  4. Grant issued

    20 Jul 2023

Application Details

Location
The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
13 September 2022Other applications received that week
Status
Application Closed
Decision
Conditional Permission
Decision Date
15 June 2023
Grant Date
20 July 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22/5777INCOMPLETED APPLICATION28 Jul 2022

The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. Ref. 17/05799 & ABP-308846-20) to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork. The cables will be under public road and private lands. A Natura Impact Statement will be submitted to the Planning Authority with this application.

Fiddane, Cooliney, Ballynoran, Coolcaum Ballyroe, Charleville Co. Cork

490m
22/6288CONDITIONAL11 Oct 2022

Permission for retention of unauthorised developments consisting of the following : (a) dwelling and entrances as constructed including ancillary works, (b) stables, fowl house and agricultural machinery shed together with vehicular entrance, (c) straw and hay shed, (d) domestic garage and associated site works

Coolcaum Churchtown Mallow Co.Cork

491m
16/6832REFUSED14 Nov 2016

To fit two velux roof windows to front roof of existing dwellinghouse, construction of domestic garage/store, hay and straw store and workshop

Coolcaum Churchtown Co. Cork

511m
06/5467CONDITIONAL13 Mar 2006

Dwelling

Coolcaum Churchtown Mallow

514m
21/5390CONDITIONAL20 May 2021

To construct a new garden equipment storage shed with all associated site and ancillary works.

Coolcaum Churchtown Mallow Co. Cork

515m
22/6889CONDITIONAL23 Dec 2022

Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwelling

Coolcaum Churchtown Mallow Co.Cork

517m
25/5110Conditional Permission9 Jun 2025

Permission to alter existing dwelling house, to include alterations to elevations of existing dwelling house, new dormer windows and an enclosed front porch, extension to the existing detached garage, provision of renewable energy type roof panels to the detached garage roof, modifications to the existing vehicular entrance, construction of a front boundary masonry blockwork wall to replace existing front boundary fence line and permission for retention of the location of the existing bored water well.

Coolcaum Churchtown Mallow Co. Cork, P51TR63

517m
25/4961INCOMPLETED APPLICATION21 May 2025

Permission to alter existing dwelling house, extension to the existing detached garage, provision of renewable energy type roof panels to the detached garage roof, modifications to the existing vehicular entrance, construction of a front boundary masonry blockwork wall to replace existing front boundary fence line and permission for retention of the location of the existing bored well.

Coolcaum Churchtown Mallow Co. Cork

526m
03/1545CONDITIONAL4 Apr 2003

Bungalow & garage

COOLCAUM, COOLCAUM,

846m
21/7246Refused3 Dec 2021

The development will consist of: . Construction of 6 no. wind turbines with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m; . Construction of turbine foundations and crane pad hardstanding areas; . Construction of new site tracks and associated drainage infrastructure; . Upgrading of existing tracks and associated drainage infrastructure where necessary; . Upgrade of entrance onto local road L1322; . All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or upgrading of existing internal watercourse and drain crossings; . Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: - Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - Rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works. . 1 no temporary construction site compound and associated ancillary infrastructure including parking; . Tree felling to facilitate construction and operation of the proposed development; . Installation of medium voltage (20/33kV) and communication underground cabling between the proposed turbines and the proposed on-site substation and associated ancillary works; . Erection of 1 no. permanent meteorological mast with a height of 100m above ground level and associated access track; . Installation of medium voltage (38kV) underground cabling and associated ancillary works between the proposed on-site substation and the existing Charleville Substation within the townland of Rathnacally. The proposed grid connection will be installed primarily within the public road and will include 2 no. watercourse crossings and the installation of 8 no. pre-cast joint bays; . All associated site development works; . A 10 planning permission and 35 year operational life from the date of commissioning of the entire wind farm. This application for planning permission is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement.

Annagh North, Coolcaum, Fiddane Cooliney, Rathnacally, Farranshonikeen Ardnageehy and Clashganniv Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?