← Back to search

Knocknagarrane Bandon

CONDITIONAL

Planning application 06/6353

Cork - Cork County Council

Proposed Development

Alterations and extension to dwellinghouse, conversion of outhouse/store to form part of dwelling, demolition of existing workshop and alterations to vehicular entrance

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Apr 2006

  2. Decision due

    6 Jun 2006

  3. Decision: CONDITIONAL

    6 Jun 2006

  4. Grant issued

    12 Jul 2006

Application Details

Location
Knocknagarrane Bandon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
12 April 2006
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 June 2006
Grant Date
12 July 2006

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
12/5535CONDITIONAL13 Jul 2012

Demolition of existing disused dwellinghouse with outbuilding, maintain an existing stone building and construction of a new dwellinghouse with outbuilding together with associated landscaping and drainage

Knocknagarrane Bandon

26m
21/5288CONDITIONAL12 May 2021

Construction of dwellinghouse and associated siteworks.

Knocknagarrane Bandon Co. Cork

65m
04/8226CONDITIONAL5 Nov 2004

Installation of treatment plant to serve existing dwelling

Knocknagarrane Old Chapel, Bandon

68m
25/4760CONDITIONAL23 Apr 2025

Permission for alterations & extension to dwelling house consisting of; to demolish rear attached shed & construct a single storey side extension, elevational changes & all associated site works

Palm Grove Knocknagarrane Bandon Co.Cork

90m
11/5018INCOMPLETED APPLICATION12 May 2011

Construction of a new front porch, ramp and living room extension

Knocknagarrane Bandon

90m
11/5179CONDITIONAL31 May 2011

Construction of a new front porch, ramp, living room extension, alterations to front and rear elevations of existing dwelling and all associated site works

Knocknagarrance Bandon Co. Cork

98m
05/9790CONDITIONAL23 Dec 2005

Dwelling and treatment unit (change of site boundaries and layout)

Knocknagarrane Old Chapel Bandon

98m
04/4690CONDITIONAL25 Jun 2004

Dwelling and treatment unit

Knocknagarrane Old Chapel Bandon

145m
25/6896Grant with Conditions19 Dec 2025

The construction of a residential development of 44 no. dwelling houses and all ancillary site development works. The proposed development comprises 4 no. 4 bedroom detached dwelling houses, 4 no. 4 bedroom semi-detached dwelling houses, 27 no. 3 bedroom detached/semi-detached/townhouse dwellings and 9 no. 2 bedroom semi-detached/terrace/end of terrace dwellings. The proposed development provides for the alteration of the property boundary of an existing dwelling, the decommissioning of the existing septic tank and percolation area serving the dwelling and its connection of the sewer network serving the proposed residential development. Vehicular and pedestrian access to the proposed development will be provided from the L2063 to the north of the site with pedestrian access also provided from the L2020/Crossmahon Road to the south. 2 no. detached 4 bedroom dwellings will be accessed via a new entrance from the L2020/Crossmahon Road. The proposed development also includes public realm improvements comprising new footpath infrastructure, the provision of pedestrian crossing on the L2020/Crossmahon Road and all other ancillary site development works.

Knocknagarrane,, Old Chapel,, Bandon, Co. Cork

147m
07/7859INCOMPLETED APPLICATION16 May 2007

Residential development of 34 no. dwellinghouses, outdoor play area, entrance and all associated site works

Knocknagarrane Old Chapel Bandon

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?