Proposed Development
Demolition of existing disused dwellinghouse with outbuilding, maintain an existing stone building and construction of a new dwellinghouse with outbuilding together with associated landscaping and drainage
View the full application file on the council's planning portal →Application Timeline
Application received
13 Jul 2012
Decision: CONDITIONAL
5 Oct 2012
Decision due
17 Oct 2012
Grant issued
12 Nov 2012
Application Details
- Location
- Knocknagarrane Bandon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 July 2012
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 October 2012
- Grant Date
- 12 November 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alterations and extension to dwellinghouse, conversion of outhouse/store to form part of dwelling, demolition of existing workshop and alterations to vehicular entrance
Knocknagarrane Bandon
Construction of dwellinghouse and associated siteworks.
Knocknagarrane Bandon Co. Cork
Installation of treatment plant to serve existing dwelling
Knocknagarrane Old Chapel, Bandon
Permission for alterations & extension to dwelling house consisting of; to demolish rear attached shed & construct a single storey side extension, elevational changes & all associated site works
Palm Grove Knocknagarrane Bandon Co.Cork
Construction of a new front porch, ramp and living room extension
Knocknagarrane Bandon
Construction of a new front porch, ramp, living room extension, alterations to front and rear elevations of existing dwelling and all associated site works
Knocknagarrance Bandon Co. Cork
Dwelling and treatment unit (change of site boundaries and layout)
Knocknagarrane Old Chapel Bandon
Dwelling and treatment unit
Knocknagarrane Old Chapel Bandon
The construction of a residential development of 44 no. dwelling houses and all ancillary site development works. The proposed development comprises 4 no. 4 bedroom detached dwelling houses, 4 no. 4 bedroom semi-detached dwelling houses, 27 no. 3 bedroom detached/semi-detached/townhouse dwellings and 9 no. 2 bedroom semi-detached/terrace/end of terrace dwellings. The proposed development provides for the alteration of the property boundary of an existing dwelling, the decommissioning of the existing septic tank and percolation area serving the dwelling and its connection of the sewer network serving the proposed residential development. Vehicular and pedestrian access to the proposed development will be provided from the L2063 to the north of the site with pedestrian access also provided from the L2020/Crossmahon Road to the south. 2 no. detached 4 bedroom dwellings will be accessed via a new entrance from the L2020/Crossmahon Road. The proposed development also includes public realm improvements comprising new footpath infrastructure, the provision of pedestrian crossing on the L2020/Crossmahon Road and all other ancillary site development works.
Knocknagarrane,, Old Chapel,, Bandon, Co. Cork
Residential development of 34 no. dwellinghouses, outdoor play area, entrance and all associated site works
Knocknagarrane Old Chapel Bandon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?