← Back to search

Ballintaggart P.O. 140 Ringaskiddy

CONDITIONAL

Planning application 07/12154

Cork - Cork County Council

Proposed Development

Construction of laboratory building (to house laboratory process development works)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Nov 2007

  2. Decision: CONDITIONAL

    3 Jan 2008

  3. Decision due

    8 Jan 2008

  4. Grant issued

    5 Feb 2008

Application Details

Location
Ballintaggart P.O. 140 Ringaskiddy
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 November 2007
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 January 2008
Grant Date
5 February 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
23/5834CONDITIONAL8 Sept 2023

Permission for construction of Bld. 124 - Site Lab Building. This will comprise a new five-storey building (circa 10,881 square metres with a maximum height of circa 30.2m above ground) which will include laboratories, a canteen, ancillary office space and plant and utility space, and associated site development works, including; roads, paths, yards, underground services and landscaping. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.

Ballintaggart & Ballybricken Ringaskiddy Co Cork

42m
07/9833CONDITIONAL24 Jul 2007

Construction of kilo technology laboratory building to house laboratory process development works, construction of chemical storage building and associated covered storage and bunded areas

Ballintaggart Ringaskiddy

65m
20/4049INCOMPLETED APPLICATION17 Jan 2020

The erection of 2 No. one storey modular buildings in the existing recycle centre compound, 2 No. one storey modular buildings to the north and 1 No. one storey modular building to the north west of the existing QA laboratory building and all associated site works at their production facility at Ballintaggart and Ballybricken Townlands, Ringaskiddy, Co. Cork. The site currently operates under an Industrial Emissions (IE) licence (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.

Ballintaggart and Ballybricken Ringaskiddy Co Cork

65m
20/4230Conditional Permission11 Feb 2020

The erection of 1 no. one storey modular building for office use and 1 no. one storey modular building for welfare use in the existing recycle centre compound, 2 no. one storey modular buildings both for office use to the north and 1 no. one storey modular building for office use to the north west of the existing laboratory building and all associated site works at their production facility. The site currently operates under an Industrial Emissions (IE) licence (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.

Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

69m
21/5402CONDITIONAL21 May 2021

1) The construction of an electrical building, 2) i) amendments to the footprint and elevations of the recently permitted water treatment and electrical building which was granted planning under Planning Ref. 20/05207, ii) the construction of a first floor electrical room extension to this permitted water treatment and electrical building. The proposed development is covered by an existing Industrial Pollution Control License No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.

Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

100m
23/6129CONDITIONAL20 Oct 2023

Construction of 2 no. one storey modular buildings for office use and 2 no. storage containers to the north of the existing Operation Support Group Building including all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.

Ballintaggart Ringaskiddy Co Cork

103m
06/12988CONDITIONAL5 Dec 2006

Replacement of 3 no. solvent towers, construction of tanker unloading facility and control room extension to plant

Ballintaggart Ringaskiddy

124m
18/4889CONDITIONAL11 Apr 2018

Construction of a 2 storey electrical room extension on the roof of the existing Laboratories and Offices Building, a service riser from the underside of the first floor level to roof level to roof level on the southern elevation and a platform on the roof of the existing Organic Synthesis Plant 1 at production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident directive applies.

Ballintaggart and Ballybricken Ringaskiddy Co. Cork

124m
19/5543CONDITIONAL12 Jun 2019

The construction of a 2 storey external utilities piperack extension enclosed with a full height perforated mesh screen at the second and third floor levels to the west, a 3 storey external utilities piperack extension enclosed with a full height perforated mesh screen at first, second and third floor to the east and an enclosed 4 storey access stairwell extending from ground level to third floor level to the east of the existing Organic Synthesis Plant 1 at production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013-14. The development refers to a modification to an establishment to which the Major Accident Directive applies.

Ballintaggart Ballybricken Ringaskiddy Co. Cork

128m
06/12315INCOMPLETED APPLICATION15 Nov 2006

Replacement of solvent towers and extension to tanker unloading facility and control room

API Plant Ballintaggart Ringaskiddy

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?