← Back to search

Quartertown Ind. Estate Mallow Co. Cork

CONDITIONAL

Planning application 08/55056

Cork - Cork County Council

Proposed Development

proposed development consists of alterations and an extension to the two-storey offices/single storey storage building (building 1), construction of a new single storey storage building (building 6), and associated siteworks (serving buildings 1 & 6)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Jul 2008

  2. Decision due

    17 Sept 2008

  3. Decision: CONDITIONAL

    7 Nov 2008

  4. Grant issued

    10 Dec 2008

Application Details

Location
Quartertown Ind. Estate Mallow Co. Cork.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
24 July 2008Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 November 2008
Grant Date
10 December 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

102m
07/55018WITHDRAWN23 Mar 2007

Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.

Quartertown Ind Est Mallow Co Cork

106m
10/55026WITHDRAWN31 May 2010

Consturction of a toilet building within their existing allotment area adjacent to the Hi-Cone building as well as the laying of a new sewer through the Hi-Cone site to connect to the existing public sewer on the adjacent industrial estate road

Quartertown Lower Mallow Co. Cork.

115m
06/55006CONDITIONAL3 Feb 2006

1) construction of warehouse building 2) extension of existing warehouse building and carrying out of all associated site works

Quartertown Ind Est Quartertown Lower Mallow Co. Cork.

134m
24/6514Conditional Permission23 Dec 2024

Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.

Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork

176m
06/55085CONDITIONAL29 Nov 2006

Construction of an extension to existing building for light, industrial, warehouse. distribution use with office area and associated works.

Quartertown Ind Est Mallow Co Cork

203m
18/5099CONDITIONAL2 May 2018

Extension of an existing industrial building and alterations to existing elevations and floor plans. The works will comprise of (1) the extension of existing building, (2) alterations of existing elevations, (3) alterations to existing floor plans and (4) all associated site works.

IDA Business & Technology Park Quartertown Lower Mallow Cork, P51 DX59

244m
26/2305Application Withdrawn4 Sept 2026

To relocate an existing vehicular entrance ,onto the existing industrial estate road, from the west side of the site to the south side of the site, together with all associated site works

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

244m
26/2583Awaiting Recommendation6 Oct 2026

Permission for an additional vehicular entrance & driveway onto the existing industrial estate road to the south side of the existing premises, together with all associated site works.

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

250m
04/632CONDITIONAL6 Feb 2004

Construction of an advance light industrial unit with septic tank, signage and associated site works

Quartertown Lower Mallow

316m
12/55017INCOMPLETED APPLICATION26 Oct 2012

Permission for a new manufacturing and warehouse facility with ancillary Plant and associated site works

IDA Industrial Estate Quartertown Lower Mallow Co. Cork.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?