← Back to search

Fair Street Mallow Co. Cork

CONDITIONAL

Planning application 08/55070

Cork - Cork County Council

Proposed Development

permission for (a) the removal of existing tennis/basketball court and part demolition of the existing gym hall (b) the extending and refurbishment of the gym hall to enable use as a drama hall, providing dressing rooms. storage and toilets at lower ground level, a stage, auditorium, storage, toilets, waiting room and foyer at ground level and a seating balcony with projector room at mezzanine level (c) the construction of a separte single-storey building for sports equipment storage and changing facilities (d) all associated site development works including landscaping, signage and lighting

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Oct 2008

  2. Decision due

    16 Dec 2008

  3. Decision: CONDITIONAL

    20 Apr 2009

  4. Grant issued

    25 May 2009

Application Details

Location
Fair Street Mallow Co. Cork.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
22 October 2008
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 April 2009
Grant Date
25 May 2009

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

60m
18/5473CONDITIONAL6 Jun 2018

The construction of prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, relocation of part of existing carpark together with all other ancillary site works.

Saint Mary's Secondary School Fair Street Mallow Co. Cork

60m
18/4892INCOMPLETED APPLICATION11 Apr 2018

Construction of prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, relocation of part of existing carpark together with all other ancillary site works.

Fair Street Mallow Co. Cork

61m
21/5714CONDITIONAL22 Jun 2021

The construction of new prefabricated school building incorporating 4 general classrooms, office and toilet facilities, connection of foul and surface water sewer systems, relocation of existing car parking to existing tennis court along with all ancillary site works.

Fair Street Mallow Td. Mallow Co. Cork

61m
21/7190INCOMPLETED APPLICATION26 Nov 2021

Permission for Retention of as built prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, footpaths and wheelchair ramps and existing temporary car park for a period of five years (permission previously granted for this development under planning reference number 18/5473).

Fair Street Mallow Co. Cork

61m
22/4158Conditional Permission1 Feb 2022

Permission for retention of as built prefabricated building consisting of 5 no. classrooms, 2 no offices, toilets and circulation space, footpaths and wheelchair ramps and existing temporary car park for a period of five years (permission previously granted for this development under planning reference number 18/5473)

Saint Mary's Secondary School Fair Street Mallow Co.Cork

61m
26/1624Awaiting F.I. Response18 Jun 2026

the following development consisting of (a) the construction of a 3 storey extension to existing post primary school, connected by new link covered walkway at first floor level. Total proposed development floor area is 2802 sqm, comprising of general classrooms, admin area, and supported education unit plus ancillary staff/student facilities with external student areas, access road, parking and drop off facilities. Development to include PV Panel installation at roof level, Heat Pump enclosure, LPG Tank enclosure. Overall site area is 2.06 Ha (b) removal of existing temporary classroom accommodation along with all related service, and reinstatement of staff car parking on vacated area , removal of temporary parking facilities to ballcourt area, 2 new accessible parking spaces (c) installation of 3 no. flag poles on concrete plinth to front of existing school to plus all associated site works

St. Mary's Secondary School, Mallow, Co. Cork, P51 PY04

61m
26/1333Invalid - Prepare Letters19 May 2026

the following development consisting of (a) the construction of a 3 storey extension to existing post primary school, connected by new link covered walkway at first floor level. Total proposed development floor area is 2802 sqm, comprising of general classrooms, admin area, and supported education unit plus ancillary staff/student facilities with external student areas, access road, parking and drop off facilities. Development to include PV Panel installation at roof level, Heat Pump enclosure, LPG Tank enclosure. Overall site area is 2.06 Ha (b) removal of existing temporary classroom accommodation along with all related service, and reinstatement of staff car parking on vacated area , removal of temporary parking facilities to ballcourt area, 2 new accessible parking spaces (c) installation of 3 no. flag poles on concrete plinth to front of existing school to plus all associated site works

St. Mary's Secondary School, Mallow, Co. Cork, P51 PY04

108m
09/55043CONDITIONAL11 Dec 2009

Permission for redevelopement of the existing convent and former school building at Fair Street, Mallow. This redevelopment comprises (i) the refurbishment and conservtion repair of the convent building (ii) demolition of parts of the convent, namely the three storey north-west wing, the upper two floors of the north -east wing, the single storey sacristy area, outoffices and covered walk, (iii) the erection of a new three storey extension to the rear of the convent linked to the main building (iv) erection of new outoffices to comprise garden stores, clothes drying area and bin compound. In addition it is intended to redevelop the former school building to change it's use to residential accomodation comprising 4 no. single living apartment units. The works also comprise associated site works to include landscaping, car parking, provision of a new covered walk and amenity areas, provision of vehicular access to the bungalow at the main entrance from the private entrance drive to the convent together with connections to the existing drainage and water supply services. The convent building is listed as a protected structure in Mallow Town Council Development Plan.

Convent of Mercy Fair Street Mallow Co. Cork.

126m
05/55037NEW APPLICATION20 May 2005

conversion of part of existing building from hostel to 2 no. apartments

Fair Street Mallow Co. Cork.

151m
05/55081CONDITIONAL11 Nov 2005

extension to the first floor and alterations to the east elevation of the building as granted under Planning P.D. 55,018/04

Fair Street Mallow Co. Cork.