Dooneens, Inchi More Tooreennanean Tooreenduff, Derryvacorneen Ballingeary
INCOMPLETED APPLICATIONPlanning application 09/256
Cork - Cork County Council
Proposed Development
Construction of eight wind turbines; Wind turbine base to tip heights are as follows: 2x119m, 5x126m and 1x139m. This renewable energy development will include a permanent 80 meter meteorological mast, substation compound with control base, onsite tracks, 2 proposed borrow pits, underground cabling and associated site works
Application Details
- Location
- Dooneens, Inchi More Tooreennanean Tooreenduff, Derryvacorneen Ballingeary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 March 2009Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of eight wind turbines in the townlands of Dooneens, Inchi More, Tooreennanean, Tooreenduff and Derryvacorneen, Ballingeary, Co. Cork. Wind turbine base to tip heights are as follows: 2x119m, 5x126m and 1x139m. This renewable energy development will include a permission 80 meter meteorological mast, substation compound with control house, onsite tracks, 2 proposed borrow pits, underground cabling & associated works
Dooneens. Inchi More. Tooreennanean. Tooreenduff. Derryvacorneen. Ballyingeary, Co. Cork.
Erection of temporary 50m high monitoring mast with wind speed & direction sensors
DERRYVACORNEEN, DERRYVACORNEEN,
8 no. wind turbines each turbine with an overall height of 107 m. , access roads , control building and substation compound and ancillary works
Derryvacorneen Carraggnamuck,Ballingeary
Dwellinghouse
DERRYVACORNEEN, DERRYVACORNEEN,
Construction of eight wind turbines in the townlands of Dooneens, Inchi More, Tooreennanean and Tooreenduff, Ballingeary, Co. Cork. The proposed wind turbines will have a maximum hub height of 80m and a maximum base to blade tip height of 121m. The renewable energy development will include wind turbine foundations and hardstand areas, a permanent 80 meter meteorological mast, substation compound with control house, onsite tracks and associated drainage, silt traps, peat deposition and restoration area, 2 borrow pits, underground cabling, temporary construction site compound, and associated works
Dooneens, Inchi More, Tooreennanean, Tooreenduff, Ballingeary, Co. Cork
Extend dwelling by adding pitched roof to existing flat roofs for use as studio
Tooreenduff Ballingeary
Dwellinghouse
INCHINOSSIG, INCHINOSSIG,
Construction of conservatory to rear of existing dwelling and construction of porch to the side of existing dwelling
Bargarriff Ballingeary Macroom Co. Cork
Construction of conservatory to rear of existing dwelling and construction of porch to the side of existing dwelling
Bargarriff Ballingeary Macroom Co. Cork
Construction of domestic garage
Bargarriff Ballingeary
The submission window has closed
Observations on this application closed on Sunday 12 April 2009, five weeks after it was received. The authority cannot accept a late submission.