Dooneens. Inchi More. Tooreennanean. Tooreenduff. Derryvacorneen. Ballyingeary, Co. Cork
WITHDRAWNPlanning application 09/401
Cork - Cork County Council
Proposed Development
Construction of eight wind turbines in the townlands of Dooneens, Inchi More, Tooreennanean, Tooreenduff and Derryvacorneen, Ballingeary, Co. Cork. Wind turbine base to tip heights are as follows: 2x119m, 5x126m and 1x139m. This renewable energy development will include a permission 80 meter meteorological mast, substation compound with control house, onsite tracks, 2 proposed borrow pits, underground cabling & associated works
Application Details
- Location
- Dooneens. Inchi More. Tooreennanean. Tooreenduff. Derryvacorneen. Ballyingeary, Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 April 2009Other applications received that week
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erection of temporary 50m high monitoring mast with wind speed & direction sensors
DERRYVACORNEEN, DERRYVACORNEEN,
Construction of eight wind turbines; Wind turbine base to tip heights are as follows: 2x119m, 5x126m and 1x139m. This renewable energy development will include a permanent 80 meter meteorological mast, substation compound with control base, onsite tracks, 2 proposed borrow pits, underground cabling and associated site works
Dooneens, Inchi More Tooreennanean Tooreenduff, Derryvacorneen Ballingeary
8 no. wind turbines each turbine with an overall height of 107 m. , access roads , control building and substation compound and ancillary works
Derryvacorneen Carraggnamuck,Ballingeary
Dwellinghouse
DERRYVACORNEEN, DERRYVACORNEEN,
Extension to dwelling and installation of septic tank
Cloghboola Inchigeela
Construction of eight wind turbines in the townlands of Dooneens, Inchi More, Tooreennanean and Tooreenduff, Ballingeary, Co. Cork. The proposed wind turbines will have a maximum hub height of 80m and a maximum base to blade tip height of 121m. The renewable energy development will include wind turbine foundations and hardstand areas, a permanent 80 meter meteorological mast, substation compound with control house, onsite tracks and associated drainage, silt traps, peat deposition and restoration area, 2 borrow pits, underground cabling, temporary construction site compound, and associated works
Dooneens, Inchi More, Tooreennanean, Tooreenduff, Ballingeary, Co. Cork
Construction of conservatory to rear of existing dwelling and construction of porch to the side of existing dwelling
Bargarriff Ballingeary Macroom Co. Cork
Construction of conservatory to rear of existing dwelling and construction of porch to the side of existing dwelling
Bargarriff Ballingeary Macroom Co. Cork
Construction of domestic garage
Bargarriff Ballingeary
Alterations and extension to dwellinghouse and retention of conversion of barn for use as extension to dwelling
Illauninagh West, Ballingeary Co. Cork
The submission window has closed
Observations on this application closed on Wednesday 13 May 2009, five weeks after it was received. The authority cannot accept a late submission.